09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2008/1867

 

10.

11.

12.

The premises are to be identified by the provision of a street number in a prominent location to
ensure it is identifiable to all persons, particularly emergency services personnel.

Building Height is to be a maximum of 3 stories and 12 metres above natural and finished
ground level as per the Noosa Pian. A verification survey of the building is to be carried out by
a Licensed Surveyor and a certificate lodged with Council at completion of work confirming
compliance with the maximum allowable buitding height as required by either the conditions of

_ approval or the Planning Scheme.

Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.

The requirements of this development approval are to be effected, prior to the use of the
premises, Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.

The Development Permit for a material change of use of premises lapses if the use has not
happened by 24 March 2013, unless an application to extend the relevant period is approved
by Council.

The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.

Building Services

13.
Lan

Fences are not permitted to exceed 2 metres above natural ground level.

Vehicle Access

14.

15.

16.

17.
18.

A vehicular access driveway shall be constructed to the site frontage with a maximum width of
3.5m within the Elanda Street Road Reserve. The driveway must then increase In width to a
minimum of 5.5m within the property to allow passage of two cars on the driveway.

The driveway shail be designed and constructed to Council's design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
the driveway be removed and reconstructed to levels that do comply.

Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall,

To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated fencing or vegetation near the driveway shall-comply with the
minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall
demonstrate compliance by illustrating these sight lines on the plans submitted for both
Operational Works approval! and Building Works approval.

All vehicles shall enter and leave the site in a forward direction.

The vehicle manoeuvring area at the northern end of the driveway shall remain unobstructed
at all times. Signage shall be installed to ensure vehicles do not park in the vehicle
manoeuvring area.

Off Street

19.

The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 1A with allowance for vehicles to enter the space ina forward gear, reverse and
leave the site in a forward gear in a total of three movements.

Page 3 of 14

 

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.