09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
phere 2008/1867 20. The carpark and driveway area must have a minimum head clearance (headroom) of 2.2m at any point. Frontage Works 21. 22, 23, Footpath improvements such as topsoiling, grassing, and tree planting are required to the Elanda Street frontage of the site in accordance with Planning Scheme Policy PSPO3 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds. A new 1.5m wide concrete path shail be constructed along the Elanda Street frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. The footpath shall connect to and match evenly with the existing footpath networks located to the north and south of the site. All paths, driveways and parking areas Shall be designed and constructed to ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility. Road Works 24, The full length of the Elanda Street frontage of the development site shail be upgraded by providing kerb and channel, bitumen road widening and landscaping improvements to the footpath. The new kerb and channel shall be aligned so that it is located 8 metres off the existing kerb and channel on the western side of the road measured from the nominal face of the kerb, All associated and ancillary work including pavement correction to the existing pavement, drainage works, modification of the footpath, and adjustments to the existing infrastructure shall be undertaken to complete the roadworks widening. In this regard, plans detailing this work shall be prepared and submitted to Council for approval prior to obtaining a Development Permit for Operational Works. Roof Water & Stormwater Drainage 25. 26. Roof runoff from any new building shall be directed to a ralnwater storage system or tank that is installed to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shall be part of the plumbing application for approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Operational Works approval and any overflow shall be directed to the approved stormwater discharge point. All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site may be discharged to Council's existing drainage structures at either the grated stormwater pit at the south east corner of the site or to the kerb and channel in the Henderson Street road reserve. Stormwater drainage permitted to drain from the site must be in accordance with an Operational Works Approval for stormwater drainage. The Operational Works application for stormwater drainage must clearly demonstrate to the satisfaction of the CEO's delegated officer that the stormwater structure nominated to receive site drainage has sufficient capacity to recelve any additional flows generated from the site. Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer of Queensland (RPEQ) and submitted to Council prior to obtaining a Development Permit for Operational Works. The maximum discharge of stormwater drainage allowable to Council's kerb & channel street drainage system at any one location is 25 litres/second. - Page 4 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.