Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
2008/1867 36. A duly executed copy of the easement shail be submitted to Council for perusal prior to the use commencing. Any changes required by Council's Solicitor must be corrected immediately. No building or other structure shall be constructed or encroach over an easement. Earthworks 37. 38, Earthworks on site shall be carried out in accordance with Council’s Planning Scheme Policy PSP5 — Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural surface levels and contours of the adjoining properties must be provided with the application for a Development Permit for Operational Works for Drainage. This may require the design and construction of drainage pipes and/or an overland flow-path within the development site that caters for drainage from the adjoining sites for a design storm with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the drainage pipes or overland flow-path will also be required. In this regard a Development Permit for Operational Works shall be obtained. Should evidence be provided to Council indicating that no additional ponding of stormwater will occur on the adjoining properties the requirement for the drainage pipes, overland flow- path and easement shall not apply. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval, Erosion and Sediment Control 39, 40. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Scour of the site shall not occur as a result of the approved development. In this respect, all overland flow path areas must be suitably stabilised. » Contributions Towards Council Infrastructure 41. Monetary contributions shalt be paid to Sunshine Cost Regional Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below: PSP 12 — Public Open Space Contributions (Park) $ 3,164 PSP16 — Sewerage Headworks Contributions $3,513 PSP17 ~ Water Supply Headworks Contributions | $4,956 PSP20 — Pathway Trunk Network Contributions $711 TOTAL Contribution Amount = $ 12,344 ‘Page 8 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.