Skip to the record
Noosa’s premier civic archive.

Council archive · source document

09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2008/1867

 

 

 

Groups Brisbane from December 2008 until the date of payment.

Please note, that these amounts are all subject to variations in the Consumer Price Index, All

 

 

All contributions must be paid prior to the issue of a Development Permit for Operational
Works. .

Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full. .

Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council's Land
Development Commercial & Regulatory Fees at the time of lodgement.

In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the paid contributions and/or the trading bank guarantee will be returned.

General

42, Any damage caused to any public utility during the course of construction shall be repaired to
Council's standards and at no cost to Council.

43. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.

44. The transportation of all materials to and from the site shall be undertaken in a manner such

that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.

Environmental Health

45.

Where the development invoives the removal, relocation or demolition of a building, a Waste
Management Plan (construction and demolition) shall be submitted prior to demolition,
removal or relocation of any building other than a shed.

Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.

Waste storage areas are to provide for adequate separation of all reusable, recyclable and

waste materials. These shail be located so that they are convenient and safe to use. (Refer to

Noosa Council Waste Management Code)

The Plan shall contain the following information: .

e The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application,

. A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled — reused or disposed.

Page 7 of 14

 

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.