STEVE RACKEMANN KNOBEL CONSULTING PTY LTD
Proposed Duplex Stormwater Management Pian
Lot 403 RP48112 - 51 Elanda Street Project No: K1595
Sunshine Beach

 

Legal Point of Discharge

It is proposed to discharge piped stormwater drainage from the site to the existing field inlet
located within the pathway to the south east of the site. Overland flows will continue to discharge
as sheet flow to the rear of the property,

 

2.2 Catchment Definition
The subject site has one (1) catchment area corresponding to the site area, Stormwater runoff
from properties to the North currently discharge to the rear of those sites. Any flows that
discharged onto the subject property will continue to do so with the addition of the new
development as construction is offset from the boundary atlowing flows to enter the subject site
unimpeded.
The Internal catchment covers 755 m? and to provide accurate pre and post runoff flows the
fraction impervious of the existing case and that of the proposed duplex have been calculated.
2.3 Rational Method
2.3.1 Coefficient of Runoff
A coefficient of runoff (Cyear) was calculated for the associated catchments based on an analysis
of the land and the fraction impervious of the existing and proposed arrangements.
Pre Development
Impervious Area - 326m? (From survey)
Fraction Impervious = 43.0%
C10 = 0.79 (QUDM 2007 Table 4.05.3(a))
Post Development
Impervious Area - 393m2 (From Design)
Fraction Impervious = 52.0%
C10 = 0.80 (QUDM 2007 Table 4.05.3(a))
The pre and post development impervious areas are shown on Knobel Consulting Pty Ltd drawing,
Pre and Post Development Impervious Area Layout Plan (Ref: K1595/SWO002/A) included as
Appendix C.
K1595-0006 5 June 2009 Page 4of8

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.