Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
STEVE RACKEMANN KNOBEL CONSULTING PTY LTD Proposed Duplex Stormwater Management Pian Lot 403 RP48112 - 51 Elanda Street Project No: K1595 Sunshine Beach 3.0 Time of Concentration A minimum time of concentration of 5 minutes has been adopted for the pre and post development scenarios. Rainfall intensities were obtained from Council Standard Drawings 9231. Design Flow Rates Design storm flow rates have been calculated for storms with an ARI of 10 and 100-year intervals and are provided in Table 1. The Rational Method provides a basis for assessing the design peak flow rate to enable the determination of the sizes for inlets, pipes and culverts and the dimensions of open channels. The Rational Method (Q = 2.78 x 10-3 CIA) has been used to calculate the required design flow rates for the subject site. Table 1: Post Development Design Flow Rate for Site Catchment Average Recurrence Interval ARI | Pre@io |, Post@io | Pre Qioo | Post Qico ” CoefficientRunoff SSCS Cc ove | 080 0.95 0.96 Area of Catchment (ha) . "as A 0.0755 0.0755 0.0755 0.0755 “Average Rainfall Intensity (mm/h) ! 225.0 225.0 320.0 320.0 Peak Flow Rate (L/s) a 37.3 378 63.8 64.4 Table | shows that the post development flow rate is approximately equal to the pre development flow rate. It is not considered necessary to provide detention given the minimal difference in flow rates, As there will not be any increase in flows to the existing stormwater system and further analysis is not required, Knobel Consulting Pty Ltd drawing, Stormwater Layout Plan (Ref: K1595/SW001/A) included as Appendix D shows the proposed internal stormwater drainage layout and proposed connection to Council's system. The internal works have been designed by Dennis Cairns and Associates Hydraulic Consultants. Sediment and Erosion Control 3.1. Construction Phase Details of the construction phase sediment and erosion controls, monitoring and maintenance are provided in the following sections. K1595-0006 § June 2009 Page 5S of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.