Skip to the record
Beware of cheap imitations.

Council archive · source document

09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

STEVE RACKEMANN KNOBEL CONSULTING PTY LID
Proposed Duplex Stormwater Management Plan
Lot 403 RP48112 ~- 51 Elanda Street Project No: K1595

Sunshine Beach

 

4.0 Conclusions

 

Knobel Consulting Pty Ltd has analysed the pre and post development stormwater discharge from
the site and determined that no detention is required as the proposed development does not
increase peak flow rate from that of the pre development scenario. The legal point of discharge for
the site shall be to the existing field inlet to the south east of the site with overland flows continuing
to discharge as sheet flow to the rear of the site.

Sediment and Erosion Control measures have been proposed for the construction phase to ensure

no adverse impacts on downstream water quality.

5.0 References

 

* — Australian Rainfall and Runoff (ARR) - Volume 1 Book 2 - Design Rainfall Considerations

= Queensland Urban Drainage Manual (QUDM) - 1992

 

K1595-0006 5 June 2009 Page 8 of 8

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0768 - Operational Works - Roadworks & Stormwater [As Published].pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.