Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
STEVE RACKEMANN KNOBEL CONSULTING PTY LID Proposed Duplex Stormwater Management Plan Lot 403 RP48112 ~- 51 Elanda Street Project No: K1595 Sunshine Beach 4.0 Conclusions Knobel Consulting Pty Ltd has analysed the pre and post development stormwater discharge from the site and determined that no detention is required as the proposed development does not increase peak flow rate from that of the pre development scenario. The legal point of discharge for the site shall be to the existing field inlet to the south east of the site with overland flows continuing to discharge as sheet flow to the rear of the site. Sediment and Erosion Control measures have been proposed for the construction phase to ensure no adverse impacts on downstream water quality. 5.0 References * — Australian Rainfall and Runoff (ARR) - Volume 1 Book 2 - Design Rainfall Considerations = Queensland Urban Drainage Manual (QUDM) - 1992 K1595-0006 5 June 2009 Page 8 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.