Council archive · source document
09/0768 - Operational Works - Roadworks & Stormwater [As Published] · 142009.768
Ho OO | oe! CU hUolCUc)lCUclClcl Ucn) ow 0 O STEVE RACKEMANN KNOBEL CONSULTING PTY LID Proposed Duplex Stormwater Management Plan Lot 403 RP48112 - §1 Elanda Street Project No: K1595 Sunshine Beach 3.1.5 Adequate waste disposal facilities are to be provided and maintained on the site to cater for all waste materials such as litter hydrocarbons, toxic materials, acids or alkaline substances. Water Quality Monitoring and Inspections To ensure that the water quality objectives are being met during the construction phase of the development water quality monitoring shall be conducted at a monitoring station as shown on Knobel Consulting Pty Ltd drawing. Sediment and Erosion Control Layout Plan & Details Sheet (Ref: K1595/SE001/A). Water quality monitoring shall use a calibrated probe or sampling and testing at a NATA registered laboratory. Location: Monitoring Station MS1 is shown on Knobel Consulting Pty Ltd drawing, Sediment and Erosion Control Layout Plan & Details Sheet (Ref: K1570/SE001/A). Parameters: Site discharge criteria. Frequency: Following at least 30 mm of rainfall in a 24 hour period. The contractor shall be responsible for the inspection and maintenance of all sediment and erosion control devices. Additional controls and review of existing controls shall be undertaken in response to the results of the above-mentioned monitoring program, Reporting An inspection report shall be written by a suitably qualified and experienced scientist/engineer following each water quality monitoring episode. The report shall include at least the following information. = Name, address and real property description for the development site; = Council file reference number (if known); * Monitoring locations; «Performance criteria; « — Results for each monitoring location, identifying any breaches of performance criteria, and » Recommended corrective actions to be taken and additional sediment and erosion controls, if required. Inspection reports shall be provided to the contractor for their action and compilation in an on-site register. If the above-mentioned performance criteria are exceeded and results from the downstream monitoring stations show significant deterioration from upstream results Gf applicable), the contractor shall implement all recommendation of the inspection report within one (1) working day of receipt of the report. K1595-0006 § June 2009 Page 7 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0768 - Operational Works - Roadworks & Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.