ORDINARY MEETING MINUTES 21 JULY 2022
Road Closure
5. An application is to be made to the Department of Natural Resources, Mines and
Energy (DNRME) to permanently close the section of road reserve along the Maple
Street frontage of proposed Lot 31.
If the application is approved, or approved in part, the area of road reserve is to be
amalgamated with adjoining lot(s) and no additional lots created. If the application
to close the road is refused, a copy of the advice from the DNRME stating that fact
must be submitted to Council prior to the signing of the Plan of Subdivision.
Boundary Encroachments
6. Certification must be submitted to Council from a Licensed Surveyor which certifies
that:
a. the setback/s to any new boundaries for any existing buildings remaining on
the site comply with the relevant provisions of the planning scheme and the
Building Act 1975, unless varied by this Decision Notice.
b. all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
easement.
c. all utility services and connections (e.g. electricity, telecommunications,
water, sewerage) are wholly located within the lot they serve or alternatively
included within an easement.
d. all existing effluent disposal areas are wholly located within the lot they serve
and comply with the boundary setback requirements of the Plumbing and
Drainage Act 2002 and associated codes and requirements.
e. all dams (including ponded water, dam walls and associated spillway
structures) are wholly located within the boundaries of a single lot.
f. all retaining walls and structures are fully contained within the lot they retain.
g. any fill, including fill batters, are wholly contained within the subject site and
not on adjacent properties.
h. for the community title scheme, the road pavement changes required by this
Decision Notice accurately demarcate the boundaries of the public and
private land.
Water & Sewer Connections
7. An underground connection to reticulated water and sewerage must be provided
to each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection
to reticulated water and sewerage has been provided to each lot.
Stormwater Drainage
8. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Services
9. Reticulated electricity and telecommunication services must be provided to each
lot in accordance with the standards and requirements of the relevant service
provider.
10. Unless otherwise stipulated by telecommunications legislation at the time of
Page 6 of 25