Attachment 1 - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Figure 3.2 – DRAINS Pre-development catchments
Figure 3.3 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under
the existing and proposed development conditions are shown in Table 3.1 Existing and
proposed unmitigated site peak discharge rates.
Page 8 of 14
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.