Log in to see the plans as drawn Table 3.1 Existing and proposed unmitigated site peak discharge rates
53 Doonella Street 55 Doonella Street Total
A.E.P Qexisting Qproposed Qchange Qexisting Qproposed Qchange Qchange
(m³/s) (m³/s) (m³/s) (m³/s) (m³/s) (m³/s) (m³/s)
1EY 0.017 0.019 0.002 0.018 0.02 0.002 0.004
50% 0.019 0.024 0.005 0.021 0.022 0.001 0.006
0.5EY 0.022 0.026 0.004 0.024 0.026 0.002 0.006
20% 0.029 0.033 0.004 0.032 0.032 0 0.004
10% 0.039 0.04 0.001 0.039 0.04 0.001 0.002
5% 0.044 0.046 0.002 0.044 0.045 0.001 0.003
2% 0.05 0.053 0.003 0.051 0.053 0.002 0.005
1% 0.056 0.06 0.004 0.056 0.058 0.002 0.006
As the site has increased the total peak flows from the site, attenuation storage will be
required to mitigate the outflows to ensure that the development does not exceed the
predevelopment levels.
To determine the attenuation required, the model for the developed site was updated to
include the proposed rainwater tanks to be provided for the development. The reuse
portion of the tank was assumed to be full at the time of the storm so only the attenuation
portion contributes to flow mitigation. The attenuation portion of the rainwater tanks was
modelled as storage nodes with 2 1.5kL storage volumes provided per development. An
iterative sizing process was used to determine a low flow outlet of 35mm and high flow
outlet of 100mm would provide the required flow rates.
Using this mitigated development model, the proposed developed flows were again
compared to the existing state as shown below in Table 3.2 Existing and proposed
mitigated site peak discharge rates.
Table 3.2 Existing and proposed mitigated site peak discharge rates
53 Doonella Street 55 Doonella Street Total
A.E.P Qexisting Qproposed Qchange Qexisting Qproposed Qchange Qchange
(m³/s) (m³/s) (m³/s) (m³/s) (m³/s) (m³/s) (m³/s)
1EY 0.017 0.014 -0.003 0.018 0.015 -0.003 -0.006
50% 0.019 0.018 -1E-03 0.021 0.016 -0.005 -0.006
0.5EY 0.022 0.021 -0.001 0.024 0.021 -0.003 -0.004
20% 0.029 0.028 -0.001 0.032 0.027 -0.005 -0.006
10% 0.039 0.035 -0.004 0.039 0.035 -0.004 -0.008
5% 0.044 0.042 -0.002 0.044 0.041 -0.003 -0.005
2% 0.05 0.048 -0.002 0.051 0.048 -0.003 -0.005
1% 0.056 0.052 -0.004 0.056 0.051 -0.005 -0.009
Page 9 of 14
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.