Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment H - Bushfire Management Plan v3

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                        Table 7: BAL Minimum Setback Requirements Summary
              Elevation                       Setback Required for Specific BAL Ratings
                                   BAL – 12.5       BAL - 19          BAL - 29          BAL - 40
     North Through Northwest         19.1m            13m              8.7m              6.4m
     (men’s accom.)
     Northeast through east          21.3m           14.6m             9.8m              7.2m
     (annex & Hall)
     Southwest (women’s              14.3m            10m              6.4m              4.7m
     accom)
     Southeast through South         13.7m            10m              6.1m              4.5m
     (women’s accom.)
     West                            14.7m            10m              6.5m              4.8m

The above setback requirements for each elevation has been provided to inform asset
protection zones required to separate the proposed development from potential sources of
bushfire hazard, given achievement of relevant building construction standards. N.B. In order
to comply with NSC minimum setback requirements, a minimum of 10m setback has been
applied.
Current setback to the west are sufficient to achieve a BAL-12.5 rating in this direction without
any additional vegetation management. Setbacks to the north through northwest, southwest
through south to southeast, and to the east through northeast are required for the proposed
development. Setback requirements to achieve BAL-19 ratings are represented in Figure 5. It
is noted that setbacks able to be achieved, by way of vegetation management, will dictate the
applicable BAL ratings for built assets of the proposed development.




 8 May 2019                      35 Rules Road, Pomona - Bushfire Management Plan V3               Page 19
                                               www.wollemi-eco.com.au
Log in to download the original file

Attachment H - Bushfire Management Plan v3.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.