Attachment H - Bushfire Management Plan v3

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                           APZ / Setback Requirements
                                                                                          13m Setback
                                                                                          10m Setback
                                                                           N.B. Not to scale.




                              Figure 5: Required Vegetation Setbacks

Final BAL Rating and Bushfire Management Plan requirements will be dictated by vegetation
setbacks able to be achieved. Once vegetation setbacks are finalised, final applicable BAL
ratings are able to be determined.
The nominated construction standards should be reviewed by an experienced
consultant/designer at the time of detailed building design. Should the proposed site layout
or vegetation setbacks identified above change, this may alter the determination of the
required BAL.

3.3 Landscaping and Vegetation Management
The landscaping and ongoing management of vegetation in areas susceptible to Bushfire
Hazard is an important tool to mitigate bushfire risk. Previously detailed APZ’s should prevent
buildings from being subjected to direct contact from flames, and reduced levels of radiant
heat in the event of a bushfire. Please note: building footprint, and location, and vegetation
setbacks able to be achieved, will dictate the asset protection zone widths required adjacent
the proposed development.

Landscaping and vegetation retention within the APZ should consider the following
guidelines:

 8 May 2019                   35 Rules Road, Pomona - Bushfire Management Plan V3                       Page 20
                                            www.wollemi-eco.com.au
Log in to download the original file

Attachment H - Bushfire Management Plan v3.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.