PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 17 JUNE 2014
(iv) Contact details of the nearest wildlife animal specialist veterinarian or other
appropriate party to humanely deal with injured wildlife.
(v) Provide comment on the clearing with relation to the provision contained
within SEQ Koala Conservation State Planning Regulatory provisions
Table 7 , column 2, parts 4 -7.
Clearing of Vegetation
27. Prior to the commencement of any works over the subject land, a Vegetation
Management Plan must be lodged with any operational works permit application. The
plan must document the following items:
(a) Vegetation removal, tree felling and lopping must be undertaken in an
environmentally sensitive manner that avoids damaging surrounding vegetation,
trees and habitat.
(b) Cleared vegetation is to be suitably processed by one of the following methods
and removed from the site:-
(i) Processing through a woodchipper or shredder. The resulting mulch is to
be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5
metres high with a minimum of 10 metres between edges of heaps.
(ii) Disposal for firewood.
(iii) Disposal for landscaping purposes
(iv) Transport to alternative site for breaking down materials provided that all
necessary permits have been obtained to allow the alternate site to be
used for this purpose
(v) Re-use for construction materials
(vi) Environmental weed species (camphor laurel, lantana) cleared from the
site shall not be mulched, with the material to be removed from the site
and disposed of in a Council approved refuse tip.
(vii) Disposal of cleared vegetation by burning or burying is not permitted.
CIVIL ENGINEERING UNIT
Easements
28. Prior to the commencement of use, a 9 metre wide easement for access purposes must
be registered against the title of Lot 1 SP222982 in favour of Lot 2 SP222982 over the
land area along the southern boundary of Lot 1 SP222982.
Site Access and Driveways
29. A sealed access driveway must be provided from Hofmann Drive and the Eenie Creek
Road service road to all parking and manoeuvring areas of the development. The works
must be undertaken in accordance with an Operational Works approval.
Parking
30. A minimum of 246 car parking and 4 motorcycle spaces must be provided and marked
within stage 1, 34 car parking and 2 motorcycle spaces must be provided and marked
within stage 2. The works must be undertaken in accordance with an Operational Works
approval.
31. Motorcycle parking is to be provided in a location close to the entrance of the buildings.
32. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Page 38 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.