2014-06-17 Planning & Organisation Committee Agenda

of 112

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  17 JUNE 2014


Service Vehicles
33.   Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
      The works must be undertaken in accordance with an Operational Works approval.
Pedestrian and Bicycle Facilities
34.   Pedestrian and bicycle facilities must be provided for the development. The works must
      be undertaken in accordance with an Operational Works approval and must include in
      particular:
      (a)    a 2.5 metre wide footpath within the Hofmann Road verge extending from the
             existing footpath adjacent to the roundabout at the entrance to the site to the
             existing footpath adjacent to the next roundabout to the northeast.
      (b)    pedestrian pathways extending through the middle of the carpark generally in
             accordance with the approved plans.
      (c)    adequate separation of all specific pedestrian routes from vehicle access and
             manoeuvring areas, and clear demarcation by pavement marking, signposts or
             changes in surface materials or levels.
      (d)    signage and lighting at strategic locations to direct people to building entries and
             toilet facilities.
      (e)    pedestrian refuge areas at strategic locations within the carpark to ensure safe
             and convenient congregating of pedestrians waiting to cross major access
             driveways
      (f)    a total of 30 bicycle parking spaces for stage 1, and 10 bicycle parking spaces for
             stage 2, which are to be located close to the entrance of the building.
      (g)    end of trip facilities involving 15 lockers, 2 showers and change rooms for stage 1,
             and 5 lockers, 1 shower and change rooms for stage 2.
HYDRAULICS & WATER QUALITY
Stormwater Drainage
35.   The site must be provided with a stormwater drainage system connecting to a lawful point
      of discharge. The works must be undertaken in accordance with an Operational Works
      approval and QUDM, and must include in particular:
      (a)    the works described in section 3 and 5 of the Site Based Stormwater Management
             Report listed in this Decision Notice.
      (b)    collection and discharge* of stormwater to Hoffman Drive.
      (c)    extension of the site stormwater system to accommodate stormwater from the
             external catchment as nominated and shown in section 4 of the site based
             stormwater management report.
      (d)    Design calculations and comments outlining how external stormwater flows will be
             managed through the site from the external upstream catchment as proposed in
             section 4 of the site based stormwater management plan. Any final design must
             include:
             (i)    a site based drainage system which accepts and conveys existing minor
                    flows from Eenie Creek Road, Commerce Court and existing industrial
                    development to the west. Detailed design calculations must be submitted
                    with a concurrent operational works application which demonstrates no
                    additional afflux on upstream private and public land.
             (ii)   a site based drainage system which accepts and conveys external
                    upstream major flows up to and including the 1% AEP flood event, without
                    increasing afflux to existing upstream private and public land.

                                                                                 Page 39 of 112
Log in to download the original file

2014-06-17 Planning & Organisation Committee Agenda(PDF, 5MB).pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.