2014-06-17 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 17 JUNE 2014
Service Vehicles
33. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval.
Pedestrian and Bicycle Facilities
34. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
(a) a 2.5 metre wide footpath within the Hofmann Road verge extending from the
existing footpath adjacent to the roundabout at the entrance to the site to the
existing footpath adjacent to the next roundabout to the northeast.
(b) pedestrian pathways extending through the middle of the carpark generally in
accordance with the approved plans.
(c) adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.
(d) signage and lighting at strategic locations to direct people to building entries and
toilet facilities.
(e) pedestrian refuge areas at strategic locations within the carpark to ensure safe
and convenient congregating of pedestrians waiting to cross major access
driveways
(f) a total of 30 bicycle parking spaces for stage 1, and 10 bicycle parking spaces for
stage 2, which are to be located close to the entrance of the building.
(g) end of trip facilities involving 15 lockers, 2 showers and change rooms for stage 1,
and 5 lockers, 1 shower and change rooms for stage 2.
HYDRAULICS & WATER QUALITY
Stormwater Drainage
35. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval and QUDM, and must include in particular:
(a) the works described in section 3 and 5 of the Site Based Stormwater Management
Report listed in this Decision Notice.
(b) collection and discharge* of stormwater to Hoffman Drive.
(c) extension of the site stormwater system to accommodate stormwater from the
external catchment as nominated and shown in section 4 of the site based
stormwater management report.
(d) Design calculations and comments outlining how external stormwater flows will be
managed through the site from the external upstream catchment as proposed in
section 4 of the site based stormwater management plan. Any final design must
include:
(i) a site based drainage system which accepts and conveys existing minor
flows from Eenie Creek Road, Commerce Court and existing industrial
development to the west. Detailed design calculations must be submitted
with a concurrent operational works application which demonstrates no
additional afflux on upstream private and public land.
(ii) a site based drainage system which accepts and conveys external
upstream major flows up to and including the 1% AEP flood event, without
increasing afflux to existing upstream private and public land.
Page 39 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.