PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 17 JUNE 2014
UNITYWATER
Water and Sewerage
46. The fire-fighting demand on Unitywater’s water supply system from the development must
not exceed 30 litres per second.
47. A single Unitywater installed primary water meter must be provided immediately inside
the property boundary. Additional water meters must be installed for each title of a
community title or sub-lease scheme. Meters must be Unitywater approved, installed in
accordance with Unitywater standards and requirements and remain accessible at all
times for reading and maintenance purposes.
48. Water meters must be located on alternative boundaries to electrical pillars.
49. Buildings and other structures must maintain a minimum clearance of 1.5 metres from
Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection
openings.
50. The applicant must adjust the level of the existing sewerage inspection opening as
necessary to suit the proposed finished levels. Work must be undertaken by Unitywater
at the owner’s cost. Where the existing sewerage inspection opening point is located
within a sealed or concreted area, a brass cap is required to be fitted.
51. Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
52. Redundant sewer pipes within the development site must be removed or slurry filled.
53. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and suitable approved
varieties.
54. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
Advisory Notes
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Equitable Access and Facilities
1. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in
addition to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
(a) the Disability Discrimination Act 1992 (Commonwealth);
(b) the Anti-Discrimination Act 1991 (Queensland); and
(c) the Disability (Access to Premises – Buildings) Standards
Page 42 of 112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.