2021-11-09 Services & Organisation Committee Meeting Agenda

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     9 NOVEMBER 2021


The lowest priced submission was tendered by Airmaster Australia (Qld) Pty Ltd, but the total hours
nominated (dedicated) by Airmaster Australia (Qld) Pty Ltd to perform the services required were
lower than the tendered average and median.
The tender evaluation panel completed the evaluation process and considered Gealy's Air-
Conditioning & Refrigeration to be the most advantageous to Council, presenting the best value for
money. Gealy's Air-Conditioning & Refrigeration tender submission is most favourable based on
their tender demonstrating the following:
       High level of experience and capability providing maintenance and servicing of HVAC systems
        services to Noosa Shire Council for over 5 years;
       Adequately resourced with an acceptable quantity of hours nominated (dedicated) to perform
        the services;
       A detailed methodology demonstrating their understanding of the scope; and
       Contributing to the local economy with the business based in Noosa.
Attachment 1 – Evaluation Spreadsheet presents the evaluation outcome of the conforming
submissions against the above criteria.
4.        Next Steps
The Trustee for Gealy's Investment Trust t/as Gealy's Air-Conditioning & Refrigeration are the
incumbent contractor to Council and therefore will continue with the new replacement contract after
the existing contract expires on 30 November 2021.
Previous Council Consideration
Nil
Finance
The maintenance and servicing of HVAC systems contractor is engaged under a schedule of rates
contract utilising existing budget from capital and operational expenditure. Expenditure against this
contract is estimated to be approximately $175,000 per year.
Risks & Opportunities
    Safety Risks                                        Mitigation
    The Trustee for Gealy's Investment Trust t/as       Prior to commencement of services, Gealy's Air-
    Gealy's Air-Conditioning & Refrigeration fails to   Conditioning & Refrigeration management plans,
    ensure the work is conducted safely and in          Safe Work Method Statements, Job Hazard Analysis
    accordance with minimum standards.                  (or similar) and other documentation will be
                                                        submitted, reviewed, and accepted by Council.
                                                        Council will undertake surveillance, regular safety
                                                        audits and inspections throughout the construction
                                                        period.



    Resource Risks                                      Mitigation
    Quality, safety, and service are affected due to    Gealy's Air-Conditioning & Refrigeration have
    resource shortages.                                 nominated a highly capable team for this project and
                                                        can add additional and appropriately skilled
                                                        resources as required.
                                                        Council can engage the services of other HVAC
                                                        maintenance contractors in the event of Gealy's Air-
                                                        Conditioning & Refrigeration being unable to supply
                                                        services. Council will regularly monitor any patterns
                                                        where Gealy's Air-Conditioning & Refrigeration are
                                                        unable to HVAC services as required, and review as
                                                        per conditions of contract.



                                                                                            Page 11 of 64
Log in to download the original file

2021-11-09 Services & Organisation Committee Meeting Agenda(PDF, 11MB).pdf · 12.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗