Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2021-11-09 Services & Organisation Committee Meeting Agenda

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         9 NOVEMBER 2021


1.      Current Projects
The major focus in the first quarter of the 21/22 FY is to:
       Continue the construction phase of several major projects that have been budgeted over
        multiple years namely - Hinterland Playground, Rufous Street Community Centre etc.
       Review tender submissions for several major projects also budgeted for construction delivery
        the 2021/22 financial year; these include two Hinterland bridges, Wahpunga Lane and
        Tablelands Rd, Tewantin Bypass stage 1, Peregian Fire Tech lab and Gympie Terrace
        Stormwater as an example.
The Design Services team are currently designing in-house 15 to 20 projects worth approximately
$2.2m, managing the external design of $15.9m and supporting the delivery of over $20m worth of
infrastructure.

Due to supply market shortages the Design Team is working with Civil Operations and the Delivery
Team to redesign or complete options analysis to avoid critical material delays and recycle stored
materials.
In addition, delivery of the 21/22 Road Reseal Program of $5.5m is underway and has expended
$1m of works completed in the first quarter. These works include the following:
       Langura Street, Noosa Heads and Camphor Road, Pinbarren
       Belwood Place, Pomona and Pioneer Road, Pomona
       School Street, Pomona and Pottery Street, Pomona
       Ambulance Street, Pomona and Weemilah Court, Cooran.

Hinterland Playground, Cooroy




    Hinterland playground crane lift of the tower structure for the flying fox being placed onsite. Totem poles
    are featured in the foreground, adding to the high-end architectural feel of the nature-based playground.




                                                                                                Page 25 of 64
Log in to download the original file

2021-11-09 Services & Organisation Committee Meeting Agenda(PDF, 11MB).pdf · 12.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.