Original source · versioned page text
Attachment 3 - Additional Information Barlow Shelley
Attached to the e-mail Further information submitted - RAL18/0009.
Only detail for the subject site was included within the FHAR although modelling of the entire catchment area and flow cross section was analysed. This was clearly conveyed within the report, as noted above, and the additional full width cross section in Figure A above shows that approximately 30% of the flow passes through the site west of the new residence and the remaining 70% bypasses the site within the Noosa National Park east of the new residence. Item 2 The modelling makes no allowance for fence blockages and appears to be too localised to provide meaningful results. While I have not inspected the site, aerial imagery shows that a tennis court is situated immediately downstream. Given the bushland catchment, there is a high potential for a chain wire fence to become highly blocked with debris and this will increase flood levels through the site. We acknowledge that the report only addresses the subject site and is not intended to be a model of the full extent of flow path upstream and downstream of the site. From Council’s Information Request dated 8 May 2018, information was only required to demonstrate that the proposed drainage easement was of sufficient width/area to encompass the 1% AEP stormwater flows. The submitted FHAR addresses this matter. Furthermore, Section 7.2.2 of the report states – “It was found that the existing residence is provided at least 580mm freeboard from the current calculated peak water surface level (14.220m AHD), being 280mm higher than the required 300mm freeboard in accordance with the latest Noosa Plan”. Any local increases in flow depth due to debris build-up against the downstream tennis court fence will not be significant enough to affect the existing residence as the floor level is approx. 800mm above the 1% AEP at the downstream face and 580mm above at the upstream face which provides an adequate factor of safety and complies with Council’s codes and policies. Item 3 No comments have been provided in regards to the flood resilience of the dwelling. It is situated within a natural bushland flow path and it will be subject to flooding from time to time (certainly below floor level). It would need to be demonstrated that the house is resilient to flooding and given consideration to the high levels of natural debris that is likely to be mobilised during a large flood. We confirm that Barlow Shelley Consulting Engineers were the structural engineers for the new eastern portion of the residence which was a known fact to Council. The opening paragraph in the FHAR dated June 2018 states – “Barlow Shelley Consulting Engineers Pty Ltd has been commissioned to undertake a Flood Hazard Assessment Report (FHAR) for the existing residence at 20 Mitti Street, Noosa Heads. This report has been prepared as an addendum above and over the previous overland flow review undertaken by Barlow Shelley Consulting Engineers dated 3 August 2016.” 1443-03 – Mitti Street, Noosa Heads 3 TS/ts
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.