Original source · versioned page text
Attachment 3 - Additional Information Barlow Shelley
Attached to the e-mail Further information submitted - RAL18/0009.
As the structural engineers we confirm that the residence was designed to suit the suit conditions and accommodates the flows notated in both our earlier report from August 2016 and the latter FHAR dated June 2018. Item 4 Flood hazard risk associated with the proposed access should be assessed in more detail and account for full catchment flows and debris. As demonstrated above and noted throughout the FHAR, the modelling already addresses the full catchment and provides sufficient detail for the subject development application, particularly considering that the residence is existing and has been designed, certified, approved and built to suit the site conditions. We trust the above information and comments are suitable to assist you with finalising this development application with Council. Should you require anything further, please don’t hesitate to contact the undersigned. Yours faithfully TONY SHELLEY – Director BEng ADCE RPEQ MIEAust For and on behalf of: BARLOW SHELLEY CONSULTING ENGINEERS PTY LTD Encl: Email from Noosa Shire Council (27 June 2018) 1443-03 – Mitti Street, Noosa Heads 4 TS/ts
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.