Attachment D- Construction Management Plan

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                     ABN 51 640 311 842
                                                                                                                                                                                                                                                                                               OFFICES
                                                                                                                                                                                                                                                                   Sunshine Coast | Brisbane | Gold Coast




Table 1: Construction Management
                         Air Quality                     Noise Management                    Vibration Control                   On-site Machinery            Storage & Handling of                  Waste Management                     Visual Impact                      Site Security &
                        Management                                                                                                 Servicing &                Dangerous Goods On-                                                         Management                          Protection of
                                                                                                                                   Maintenance                         Site                                                                                                 Employees and the
                                                                                                                                                                                                                                                                                  Public
 Issue              Increased windborne                Public noise nuisance from         Vibration damage to                Potential for spillage or       Potential for spillage or          Appropriate disposal of all      Loss of visual amenity due          Unauthorised access to
                     sediment loads during the           construction vehicles and           neighbouring structures.            leakage of                       leakage of                          construction site waste.          to construction, machinery           the site leading to
                     construction phase.                 equipment.                         Nuisance.                           chemical/petroleum               chemical/petroleum                                                    and/or equipment.                    vandalism, theft or
                                                        Worker health and safety.                                               products and regulated           products and regulated                                                                                     personal injury.
                                                                                                                                 wastes to waters.                wastes to waters.

 Objective          To reduce construction             To undertake all reasonable        To ensure ground                   To minimise the effect of       To minimise the risk of            To take all reasonable and       To undertake construction           To limit access to the
                     impacts on air (Quality and         and practicable measures            vibrations do not cause             on-site machinery                health hazards caused by            practicable steps to reduce       using all reasonable and             construction site for
                     to help minimise                    to prevent or minimise              damage to adjacent                  maintenance.                     the storage and transport           and recycle waste during          practicable measures to              authorised personal
                     inconvenience to                    noise nuisance to                   buildings or cause                 To undertake all                 of dangerous goods.                 the construction phase            minimise impact on visual            during works hours only.
                     neighbouring properties             neighbouring properties             annoyance to nearby                 reasonable and practical        To undertake all                    and to dispose of it in an        amenity.
                                                                                             residents properties                measures to minimise             reasonable and practical            appropriate manner.
                                                                                                                                 contamination of land and        measures to minimise
                                                                                                                                 waters.                          contamination of land and
                                                                                                                                                                  waters

 Performance        Standard construction              Standard construction              Standard construction              No release of                   All dangerous goods to be          Absence of waste and             Minimal adverse visual              No unauthorised access
                     hours shall be limited to           hours shall be limited to 7         hours shall be limited to 7         contaminants to land or          stored, handled and                 litter in the construction        impact.                              to the construction site.
                     7.00 am to 5.00 pm                  am to 6 pm Mondays to               am to 5 pm Mondays to               water.                           bunded, according to                site, access road and            No excessive complaints.
                     Mondays to Saturdays                Saturdays.                          Saturdays.                         Avoid any adverse effects        Australian Standards,               buffers.
                     unless otherwise authorised        No unreasonable noise              Vibration is to comply with         on the construction site         including AS2508, AS1678,          No complaints.
                     by council.                         releases.                           AS2436 or MRS 51 or                 due to the maintenance           AS1940, and AS2931.
                    No works to be carried out         In the absence of                   equivalent standard.                and servicing of                No release of
                     on a Sunday or public               quantitative monitoring            No excessive complaints             machinery.                       contaminants to land and
                     holidays. Dust plumes               during the construction             from neighbouring                                                    water.
                     created from the                    phase, noise levels are to          residences
                     construction site and/or            be controlled to accord            No unreasonable
                     haulage of materials are to         with accepted industry and          vibrations
                     be eliminated no                    regulatory requirements
                     complaints from
                     neighbours

 Control            Prior to commencement of           Prior to commencement of           Prior to commencement of           A bunded service area is        Dangerous goods shall be           Designate a waste                Rubbish and waste to be             The nominated point on
                     construction, neighbouring          construction, neighbouring          construction, neighbouring          required for maintenance         stored separately in                collection area on- site          collected from site.                 the plan.
 Measures
                     residents and emergency             residents and emergency             residents and emergency             and servicing -significant       bunded areas not                    that does not receive a          Surplus construction                Barricades and safety
                     services shall be notified in       services shall be notified in       services shall be notified in       vehicle maintenance shall        assessable to unqualified           substantial amount of             material to be promptly              fencing shall be erected
                     writing (by letter drop of          writing (by letter drop of          writing by letter drop of           be conducted off-site at         persons without                     runoff from upland areas          removed from the                     around the site and
                     the construction period,            the construction period,            the construction period,            appropriate facilities.          appropriate training in its         and does not drain directly       construction site.                   adjacent to public
                     designated working hours            designated working hours            designed working hours             Light maintenance may be         handling and first aid              to a water body.                                                       access ways. The site
                                                                                                                                                                                                                                       Vegetation disturbance to
                     and contacts regarding              and contacts regarding              and contacts regarding              undertaken on-site in the        procedures.                        Ensure regular collection                                              access is to be gated.
                                                                                                                                                                                                                                        be minimised
                     complaints of excessive air         complaints of excessive             complaints of excessive             bunded service area.            Chemical data, handling             of on-site waste.                                                     Generally, construction
                     quality deterioration.              noise.                              vibration.                                                           and safety sheets for all
                                                                                                                                The contractor is to                                                Disposal of waste                                                      activates to be
                    Vegetative ground covers           Adjacent residences are to         Use construction                    provide suitable access to       dangerous goods will be             collection bins is to be                                               fenced/hoarded from
                     are to be maintained where          be advised of any works to          techniques that minimise            surfacing for all-weather        kept in the site office.            clearly marked                                                         adjacent properties.
                     possible.                           be conducted out of the             the need for blasting, rock         purposes.                       Only necessary quantities           "conventional waste",                                                 The construction site
                    Activities are to only be           standard construction               breaking and pile driving.                                           of chemicals, fuels and oils        "recyclable" and
                                                                                                                                Safe handling techniques                                                                                                                    compound is to be
                     conducted during suitable           hours.                             Undertake geotechnical                                               should be kept on the               "regulated waste". Ensure
                                                                                                                                 and required refuelling.                                                                                                                    locked at all times
                     weather conditions.                All construction staff are to       investigation as necessary                                           construction site at any            that all containers are                                                outside of work hours.
                                                                                                                                Waste oils are to be
                    A water truck ur spray              have adequate noise                 to predict vibration effects                                         time.                               fitted with lids.
                                                                                                                                 collected and transported                                                                                                                  The site shall be
                     apparatus is to be provided         protection as per                   of construction techniques.                                         Equipment is to be                 Regulated wastes shall be
                                                                                                                                 to recyclers or designated                                                                                                                  appropriately
                     on site when required.              workplace health and               Undertake activities likely                                          available in fuel storage           sealed in an appropriate
                                                                                                                                 disposal sites.                                                                                                                             maintained to provide a
                                                         safety.                             to cause vibration during                                            areas and in vehicles to            licensed to receive such
                    Exposed areas such as                                                                                      Servicing of plant and                                                                                                                      safe work environment
                     cleared areas and                  All plant and machinery             normal construction hours.                                           contain and clean up any            waste.                                                                 for all personal, visitors
                                                                                                                                 equipment should be
                     stockpiles, are to be               used during construction                                                                                 spills that may occur.                                                                                     and the general public.
                     watered and kept damp in            must be fitted with exhaust




                                                                                                                                                                                                                                                                                    Page 7 of 9
Log in to download the original file

Attachment D- Construction Management Plan.pdf · 670 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.