Attachment D- Construction Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Table 1: Construction Management
Air Quality Noise Management Vibration Control On-site Machinery Storage & Handling of Waste Management Visual Impact Site Security &
Management Servicing & Dangerous Goods On- Management Protection of
Maintenance Site Employees and the
Public
Issue Increased windborne Public noise nuisance from Vibration damage to Potential for spillage or Potential for spillage or Appropriate disposal of all Loss of visual amenity due Unauthorised access to
sediment loads during the construction vehicles and neighbouring structures. leakage of leakage of construction site waste. to construction, machinery the site leading to
construction phase. equipment. Nuisance. chemical/petroleum chemical/petroleum and/or equipment. vandalism, theft or
Worker health and safety. products and regulated products and regulated personal injury.
wastes to waters. wastes to waters.
Objective To reduce construction To undertake all reasonable To ensure ground To minimise the effect of To minimise the risk of To take all reasonable and To undertake construction To limit access to the
impacts on air (Quality and and practicable measures vibrations do not cause on-site machinery health hazards caused by practicable steps to reduce using all reasonable and construction site for
to help minimise to prevent or minimise damage to adjacent maintenance. the storage and transport and recycle waste during practicable measures to authorised personal
inconvenience to noise nuisance to buildings or cause To undertake all of dangerous goods. the construction phase minimise impact on visual during works hours only.
neighbouring properties neighbouring properties annoyance to nearby reasonable and practical To undertake all and to dispose of it in an amenity.
residents properties measures to minimise reasonable and practical appropriate manner.
contamination of land and measures to minimise
waters. contamination of land and
waters
Performance Standard construction Standard construction Standard construction No release of All dangerous goods to be Absence of waste and Minimal adverse visual No unauthorised access
hours shall be limited to hours shall be limited to 7 hours shall be limited to 7 contaminants to land or stored, handled and litter in the construction impact. to the construction site.
7.00 am to 5.00 pm am to 6 pm Mondays to am to 5 pm Mondays to water. bunded, according to site, access road and No excessive complaints.
Mondays to Saturdays Saturdays. Saturdays. Avoid any adverse effects Australian Standards, buffers.
unless otherwise authorised No unreasonable noise Vibration is to comply with on the construction site including AS2508, AS1678, No complaints.
by council. releases. AS2436 or MRS 51 or due to the maintenance AS1940, and AS2931.
No works to be carried out In the absence of equivalent standard. and servicing of No release of
on a Sunday or public quantitative monitoring No excessive complaints machinery. contaminants to land and
holidays. Dust plumes during the construction from neighbouring water.
created from the phase, noise levels are to residences
construction site and/or be controlled to accord No unreasonable
haulage of materials are to with accepted industry and vibrations
be eliminated no regulatory requirements
complaints from
neighbours
Control Prior to commencement of Prior to commencement of Prior to commencement of A bunded service area is Dangerous goods shall be Designate a waste Rubbish and waste to be The nominated point on
construction, neighbouring construction, neighbouring construction, neighbouring required for maintenance stored separately in collection area on- site collected from site. the plan.
Measures
residents and emergency residents and emergency residents and emergency and servicing -significant bunded areas not that does not receive a Surplus construction Barricades and safety
services shall be notified in services shall be notified in services shall be notified in vehicle maintenance shall assessable to unqualified substantial amount of material to be promptly fencing shall be erected
writing (by letter drop of writing (by letter drop of writing by letter drop of be conducted off-site at persons without runoff from upland areas removed from the around the site and
the construction period, the construction period, the construction period, appropriate facilities. appropriate training in its and does not drain directly construction site. adjacent to public
designated working hours designated working hours designed working hours Light maintenance may be handling and first aid to a water body. access ways. The site
Vegetation disturbance to
and contacts regarding and contacts regarding and contacts regarding undertaken on-site in the procedures. Ensure regular collection access is to be gated.
be minimised
complaints of excessive air complaints of excessive complaints of excessive bunded service area. Chemical data, handling of on-site waste. Generally, construction
quality deterioration. noise. vibration. and safety sheets for all
The contractor is to Disposal of waste activates to be
Vegetative ground covers Adjacent residences are to Use construction provide suitable access to dangerous goods will be collection bins is to be fenced/hoarded from
are to be maintained where be advised of any works to techniques that minimise surfacing for all-weather kept in the site office. clearly marked adjacent properties.
possible. be conducted out of the the need for blasting, rock purposes. Only necessary quantities "conventional waste", The construction site
Activities are to only be standard construction breaking and pile driving. of chemicals, fuels and oils "recyclable" and
Safe handling techniques compound is to be
conducted during suitable hours. Undertake geotechnical should be kept on the "regulated waste". Ensure
and required refuelling. locked at all times
weather conditions. All construction staff are to investigation as necessary construction site at any that all containers are outside of work hours.
Waste oils are to be
A water truck ur spray have adequate noise to predict vibration effects time. fitted with lids.
collected and transported The site shall be
apparatus is to be provided protection as per of construction techniques. Equipment is to be Regulated wastes shall be
to recyclers or designated appropriately
on site when required. workplace health and Undertake activities likely available in fuel storage sealed in an appropriate
disposal sites. maintained to provide a
safety. to cause vibration during areas and in vehicles to licensed to receive such
Exposed areas such as Servicing of plant and safe work environment
cleared areas and All plant and machinery normal construction hours. contain and clean up any waste. for all personal, visitors
equipment should be
stockpiles, are to be used during construction spills that may occur. and the general public.
watered and kept damp in must be fitted with exhaust
Page 7 of 9