Attachment D- Construction Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ABN 51 640 311 842
OFFICES
Sunshine Coast | Brisbane | Gold Coast
Air Quality Noise Management Vibration Control On-site Machinery Storage & Handling of Waste Management Visual Impact Site Security &
Management Servicing & Dangerous Goods On- Management Protection of
Maintenance Site Employees and the
Public
order to minimise erosion silences or noise undertaken outside of Release any clean Schedule waste collection Appropriate warning
or the potential for dust suppression equipment, normal construction hours. stormwater accumulated is required to prevent the signs shall be erected
creation must be in good operating in temporary bunded containers from overfilling. for the work force and
Vehicle speed is to be conoition and meet areas. the general public to
limited on site to minimise emission standards. highlight hazardous
dust generation Haulage routes shall avoid activities within and
residential areas and use around the site
Trucks entering or exiting
dedicated routes roads including: excavation:
the site shall have their
where possible. demolition: the use of
loads covered
explosives power tools
All construction vehicles exposure to high noise
exiting site shall pass emissions.
through a wheel wash
Strict housekeeping
down and/or drive over a
shall apply to all entries
shake down grid which will
used for site access or
be located at the site
egress, including entry
entry/exit
to site sheds and
Haulage routes shall avoid employees facilities.
residential areas and use
sealed roads where
possible
Machinery shall be fitted
dust filters all equipment
and vehicles are to meet
relevant emission
standards.
Maintenance of wind
breaks and barriers where
possible stockpiles heights
are to be kept to
manageable heights for
dust and erosion control
purposes
Protection of long term soil
stock piles with
revegetation,
watering/moisture or hydro
mulching where practicable
Revegetate as soon as
possible following
construction
Responsibility The contractor holds The contractor holds The contractor holds The contractor holds The contractor holds The contractor holds The contractor holds The contractor is
responsibility for the site. responsibility for the site. responsibility for the site. responsibility for the site. responsibility for the site. responsibility for the site responsibility for responsible for the
The contractor is The contractor is the site designated site
responsible for public responsible for public compound security
notification via a letter notification via a letter fencing.
drop. drop.
Monitoring The contractor shall A complaints register to be The contractor is The contractor is The contractor is Daily visual inspections of Regular inspections for Daily visual inspections
conduct daily visual maintained. responsible for frequent responsible for daily visual responsible fur daily visual the site are to be unreasonable of the site will be
inspections of the site fur All genuine noise inspections of the site inspections of the site. inspections df the site. conducted. visual impacts. undertaken for the
dust plumes. a complaint complaints shall be during impact works. regular inspections will be a complaint register is to adequacy of site
register is to be maintained investigated and assessed undertaken of all be maintained. security.
to determine if the noise is temporary chemical and
unreasonable. Such
Page 8 of 9