Attachment D- Construction Management Plan

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                            ABN 51 640 311 842
                                                                                                                                                                                                                                                                                      OFFICES
                                                                                                                                                                                                                                                          Sunshine Coast | Brisbane | Gold Coast




                     Air Quality                    Noise Management                   Vibration Control                 On-site Machinery             Storage & Handling of                 Waste Management                     Visual Impact                     Site Security &
                    Management                                                                                             Servicing &                 Dangerous Goods On-                                                        Management                         Protection of
                                                                                                                           Maintenance                          Site                                                                                               Employees and the
                                                                                                                                                                                                                                                                         Public
                                                    investigations may require                                                                             petroleum product
                                                    noise monitoring to                                                                                    storage areas for leakages.
                                                    determine if a problem of
                                                    breach exists.

Corrective      Corrective actions will           Unreasonable noise caused         Should complaints arise,         The contractor shall             If damaged goods are              Prompt delegation of             Visually offensive                 Installation of increased
                 include a review of existing       by machinery is to be              measures shall be taken by        ensure on-site machinery          spilt, the contractor shall        clean up works.                   components of                       security measures
Actions
                 control measures for               remedied by appropriate            the contractor to modify          is stored within the secure       ensure that the area is           Increased vigilance.              construction should be              required.
                 inadequacies.                      repairs and a maintenance          the offending equipment           designated compound               isolated and minimised.                                              identified and if
                should complaints arise,           schedule review.                   or modify construction            after working hours.             Petroleum or chemical                                                possible modified in
                 the contractor shall ensure       The relevant activity may          practices to ensure              The contractor shall              spillages are to be                                                  consultation with
                 measures are taken to              require modification or            vibrations are within             ensure any unauthorised           immediately, cleaned up                                              complaint.
                 modify the offending               relocation.                        relevant guidelines.              maintenance is ceased             with adsorbent material.
                 equipment or modify               Specific machinery may                                               immediately and moved            Absorbent materials used
                 construction practices to          require an alteration to its                                         off-site.                         for clean up or waste
                 reduce dust levels within          hours of operation.                                                 The contractor shall              dangerous goods are to
                 relevant guidelines                                                                                     ensure any area damaged           be placed and sealed in an
                                                   Corrective actions will
                                                    include a review of existing                                         by hydrocarbons or                appropriate container
                                                    control measures for                                                 hazardous chemicals is            marked "regulated waste"
                                                    inadequacies.                                                        fenced, excavated and             and consigned to a waste
                                                                                                                         removed from site to a            contractor licensed to
                                                   In the event that a non-
                                                                                                                         designated dumping area           receive such waste for
                                                    conformance has occurred
                                                                                                                         and the area re-                  disposal at an approved
                                                    as a result of poor work
                                                                                                                         established.                      facility.
                                                    practices, personnel on-site
                                                    will be made aware of the                                                                             The damaged area is to be
                                                    problem and informed of                                                                                re-established.
                                                    acceptable work practices.

Reporting       Weekly reporting by the           Weekly reporting by the           Weekly reporting by the          Weekly reporting by the          Weekly reporting by the           Weekly reporting by the          Weekly reporting by the            Weekly reporting by the
                 principal contractor to the        principal contractor to the        principal contractor to the       principal contractor to the       principal contractor to the        principal contractor to the       principal contractor to the         principal contractor to
                 consultant covering the            consultant covering the            consultant covering the           consultant covering the           consultant covering the            consultant covering the           consultant covering the             the consultant covering
                 effectiveness of the               effectiveness of the               effectiveness of the              effectiveness of the              effectiveness of the               effectiveness of the              effectiveness of the                the effectiveness of the
                 management system and              management system and              management system and             management system and             management system and              management system and             management system and               management system
                 noting any corrective              noting any corrective              noting any corrective             noting any corrective             noting any corrective              noting any corrective             noting any corrective               and noting any
                 actions taken.                     actions taken.                     actions taken.                    actions taken.                    actions taken.                     actions taken.                    actions taken.                      corrective actions taken.




                                                                                                                                                                                                                                                                           Page 9 of 9
Log in to download the original file

Attachment D- Construction Management Plan.pdf · 670 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.