24-01-2020 - Appeal No. 245 of 2019 - Final Order of Judge Rackemann · 51987.2951.01
Attachment 1
Working Notes: M Design and Fourteen Enterprises Pty Ltd as trustee v Noosa Shire
Council – 42 Seaview Terrace, Sunshine Beach, prepared by Omtrek dated July 2019;
and
Attachment 2
Geotechnical Report, proposed swimming pool 42 Seaview Terrace, Sunshine Beach,
Updated in Response to Joint Information Request by Coastal Engineering Experts,
prepared by Core Consultants Pty Ltd and dated 24 September 2019; and
Attachment 3
Core Consultants email advice of 27 September 2019; and
Attachment 4
Coastal Erosion Historic Assessments by Neil Collins
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned within 2 weeks of written advice by the applicant that all conditions have been
met and satisfactory inspection by Council officer confirming performance of the conditions
of approval less any costs incurred by Council in respect of enforcing performance of this
permit. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Landscaping
6. The existing trees, in particular the Pandanus tectorius located in the south east corner of
the site must be retained as shown on the approved plan by M Design, Drawing No. 2.1,
Issue C, dated 18 September 2018.
7. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
8. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the drip line of the vegetation;
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared; and
d. using low impact construction techniques around vegetation.
Earthworks
9. Earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Geotechnical Stability
10. All works must be carried out strictly in accordance with the geotechnical report prepared by
Core Consultants Pty Ltd and dated 24 September 2019, including the following
recommendations (which are the minimum specifications):
10.1. piles are to be a minimum of 10m deep;
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
24-01-2020 - Appeal No. 245 of 2019 - Final Order of Judge RackemannRelated documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.