24-01-2020 - Appeal No. 245 of 2019 - Final Order of Judge Rackemann · 51987.2951.01
McInnes Wilson Lawyers
Table 2: Summary of modelling results.
Case Figure Description FOS Comments
The FOS value of 0.9 above the erosion cut indicates slope
failure. A vertical erosion cut will likely lead to a series of
retrogressive upslope translational failures in the loose or
Figure Vertical cut into slope medium dense sand, the exact nature of which will depend
Case 1 0.9
B1 caused by erosion on the impact of vegetation and localised variation in ground
conditions. The slip surface shown is considered a likely
outcome based on our previous experience in similar
Situations.
Lower slope failure
Following reprofiling of the slope as a result of the initial
following reprofiling of slope
Figure lower failure, retrogressive failure of the slope is likely (FOS
Case 2 due to failure from Case 1 0.8
B2 values of 1 or less indicate failure).
Retrogressive upper slope Following reprofiling of the slope as a result of the
downslope translational failure(s), further instability of the
Figure failure following reprofiling
Case 3 of slope due to lower 1.0 upper slope is likely (FOS values of 1 or less indicate
B3
translational failure from failure). Such failure is likely to extend under the proposed
Case 2 pool if founded on shallow footings.
Stability analysis If the pool is supported on appropriately designed micro-
following reprofiling of piles, the potential critical slip surface takes the form of a
Figure
Case 4 slope from Case 1 and 1.6 deep- seated failure. However the FOS is acceptable, even
B4
Case 2, with the pool with a reprofiled slope following the erosion cut and
supported on micro-piles subsequent retrogressive failures from Cases 1 and 2
7.0 RECOMMENDATIONS
It is recommended that the proposed pool is supported on micro-piles founded into the underlying natural
dense or very dense sand, as per the recommendations below. The micro-piles will also improve the overall
stability of the dune in this area and will not impact adjacent properties.
Conceptual micro-pile design provided by PCA ground Engineering is attached in Appendix C. Detailed
design will be required by the piling contractor.
The micro-pile system should comprise an ‘A-frame’ structure at the eastern edge of the pool, including one
vertical and one raked pile to resist potential lateral movement in the sands, tied together with a steel-
reinforced concrete capping beam. A row of vertical piles and capping beam is recommended along the
western edge. Grout ‘columns’ should be installed between the micro-piles to prevent flow of sand between
piles. The piles should be at least 10 m deep, with minimum preliminary spacings as shown in Appendix C.
Micro-piles have been successfully used in similar slope stabilisation/remediation projects, including the Park
Road boardwalk and slope stabilisation in Noosa Heads and for a residential development at the northern
end of Seaview Terrace. Micro-piles are able to be installed using small installation equipment to suit the
site’s access constraints.
The following additional recommendations are made for the proposed development:
▪ Disturbance to the surrounding slopes should be kept to a minimum (vegetation must
be maintained below the proposed pool)
▪ Revegetation of any bare slopes around the development should be undertaken
▪ Additional fill must not be placed on the slope
▪ Excavations into the upper slope should be limited, with adequate
temporary/permanent support provided. Excavations in the middle or lower portions
of the slope must be avoided
J000867-003-R-Rev0 Page 9
064
73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
24-01-2020 - Appeal No. 245 of 2019 - Final Order of Judge RackemannRelated documentApplication case desk ↗