Skip to the record
Accept no substitutions.

Original source · versioned page text

EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES (Referred from Planning and Environment Committee dated 8 August 2023 - Item 5.1) · Attachment 2 EBFRMP 2023 Draft - tracked changes

of 107

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 Measure                                                     Responsibility   Timeframe

 KPI 7.1 Conduct a desktop review of the extent of EBFR      Environmental    Baseline
 vegetation and EBFR RE and HVR vegetation every two         Services         established 23-
 years, using remote sensing data collected under the                         24Every two
                                                             Climate
 Coastal Monitoring Plan. Vegetation % cover of available                     years
                                                             Change
 land continues to increase.

 KPI 7.2 Monitor for any changes in the EBFRs RE             Environmental    Baseline
 mapping every five years by measuring number of             Services         established 21-
 mapped REs and high value regrowth, using desktop                            2022Every 5
 mapping, vegetation management mapping and aerial                            years
 photos. RE diversity is maintained or increased.

 KPI 7.3 Undertake BOA mapping in every 5 years. Only        Environmental    Every 5
 conduct BOA condition mapping in coastal areas during       Services         yearsCompleted
 summer, when glory lily is showing. Compare against
 management zone rehabilitation targets in ecological
 rehabilitation plan, aiming for 75% or better compliance.

 Conduct a landscape ecology review of the EBFRs during      Environmental    Establish
 the review of this plan, assessing patch size, internal     Services         baseline 24-25
 connectivity and landscape connectivity. Patch size,
                                                                              Every 4 years
 internal connectivity and landscape connectivity is
 increased.




Eastern Beaches Foreshore Reserves Management Plan 2023                                   Page 44
Log in to download the original file

Attachment 2 EBFRMP 2023 Draft - tracked changes.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.