Skip to the record
The only place to find full transcripts.

Original source · versioned page text

EASTERN BEACHES FORESHORE RESERVES MANAGEMENT PLAN - COMMUNITY CONSULTATION OVERVIEW AND PROPOSED CHANGES (Referred from Planning and Environment Committee dated 8 August 2023 - Item 5.1) · Attachment 2 EBFRMP 2023 Draft - tracked changes

of 107

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 13.3. Work with Unitywater, and community         Infrastructure Services      Medium 2022/23
 members to prioritise and develop catchment       Environmental Services       ongoing and
 management plans for coastal creeks that:         Environmental                ongoing
     • consider all sources of water and           HealthEnvironmental
         influences on hydrology                   Services
     • rank and prioritise remediation works on    Unitywater
         land slips, slumps and other impacts
     • assess stormwater management
         requirements for the catchment
     • consider degraded natural and social
         values alongside other stormwater
         related impacts.
 14.3. Work with Unitywater, the State
 Government and community members to
 restore bushland and improve water quality at
 Burgess Creek.
 13.4. Work with Unitywater and Infrastructure     Infrastructure Services Medium2022/23
 Services to prioritise, plan, schedule and        Environmental Services  ongoing
 implement the management of coastal creek         UnitywaterEnvironmental
 mouth alignment and erosion where necessary       Services
 for Burgess Creek.                                Environmental Health
 14.4. Advocate to State government for            Infrastructure Services
 comprehensive water quality assessments and
 standards for all coastal creeks and inshore
 marine environments


 Measures                                                 Responsible           Due date and
                                                          partyResponsibility   statusTimeframe
 Record
 Creeks are recognised in ecological restoration plans    Infrastructure
 and targeted for restoration.                            Services              MediumEvery 5
                                                          Environmental         years
                                                          Services




Eastern Beaches Foreshore Reserves Management Plan 2023                                   Page 62
Log in to download the original file

Attachment 2 EBFRMP 2023 Draft - tracked changes.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.