riparian buffer and the pump station, and also some uncertainties around the proposed pump station in the absence of a
report addressing this particular element of the proposal. To address these areas, I can provide the following advice /
recommendations:


          Seqwater supports the 20m average setback and riparian buffer width for all uses to the minor stream on the
         subject site. The 10m additional buffer strip affords important additional protection to the watercourse and
         riparian vegetation, given the high impact nature of some uses proposed. The response letter prepared by
         Saunders Havill Group (Keira Grundy, dated 20 November 2014) and the Ecological Assessment Report (EAR -
         prepared by Saunders Havill Group, dated 24 June 2014) both make brief reference to weeding and revegetation
         of the 20m riparian buffer area, however no Rehabilitation and Weeding Management Plan has been provided
         with the application material. The Landscape Masterplan (Prepared by Saunders Havill Group, dated 10
         February 2014) makes reference only to weeding in the riparian buffer area and planting in the additional 10m
         buffer strip.

         Given the degraded state of the existing riparian buffer (as evidenced in the aforementioned environmental
         advices) and the high impact nature of some of the proposed uses within a drinking water supply catchment,
         Seqwater considers it appropriate for a staged rehabilitation plan, including select and controlled weeding and
         revegetation to be developed for the existing riparian buffer. This should occur in addition to the proposed
         planting in the 10m buffer strip. It is recommended that a Rehabilitation and Weed Management Plan is
         prepared by a qualified professional at the appropriate stage of development and approved / endorsed by
         Council prior to development commencing on the site. Seqwater requests a copy of any such plan for review
         when available.

          The Water and Sewerage Network Analysis (prepared by GHD, dated November 2014) mentions that it does not
         cover internal site servicing. No report specifically addressing the private pump station required on site has been
         prepared, therefore no information exists as to the capacity, maintenance or emergency response measures
         associated with this infrastructure. Seqwater recommends the preparation of an Inspection and Maintenance
         Schedule and an Emergency Response and Contingency Plan for the pump station. This should be endorsed /
         approved by the relevant authorities (Council, DEHP). Seqwater requests a copy of any such plan for review when
         available.

         Should the location of the proposed on-site sewerage pump station change, Seqwater requires that this facility
         maintains at least a 50m setback from the surveyed high bank of the watercourse on the site.

          Seqwater strongly supports provision of at least 25% and up to 50% more emergency storage capacity at the
         pump station, than that required by the SEQ Sewer and Water Code.

          Seqwater requests to be included on a notification register in the event of any overflow / spill / other sewage
         discharge event “

Subsequent to the above advice, further advice was sought from Seqwater with regards to whether the Weeding
Management Plan and Rehabilitation plan and the Inspection and Maintenance schedule and an Emergency
Response and contingency plan for the pump station could be submitted for approval prior to issue of any
operational works approval for the site as an appropriate trigger point for Council to set timing for the conditions.
In response Seqwater advised that the above approach was acceptable to them.




                                                             6
Log in to download the original file

MCU14_0056 Information Response Cover Letter.pdf · 736 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.