MCU14/0056 Information Response Cover Letter

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Item 16 -

Provide detailed assessment of the upstream drainage catchment/s taking into consideration any overflows from
adjacent catchments and stormwater runoff from roads (eg from Bruce Highway) onto the site. The assessment and
report must be prepared by RPEQ specialised in this field and include in particular:

(a) Plan/s and data showing the extent of flooding (floodline) for 1% AEP storm event on the development site and the
relevant downstream properties and roads (eg the Golf Course and Myall Street) for pre-development conditions.
(b) The general internal drainage layout and any proposed or anticipated required stormwater drainage works and
mitigation works external or internal to the site.
(c) Plan/s and data showing the extent of flooding for post development conditions on the fully developed site and the
relevant downstream properties and roads for 1%, 5% and 10% AEP storm events.
(d) Identification of potential adverse impact on other properties and recommended mitigation measures.
Response:

Refer to Stormwater Quantity Management Plan prepared by Storm Water Consulting Pty Ltd (Attachment D)



Item 17 -

Provide plan/s to illustrate the estimated amount and levels of the earthworks required on the site and include cross
sections to demonstrate the changes in finished levels, and associated structures, within the development site.
Response:
Refer to Plan SK 01 Rev A prepared by VTE Consulting Engineers at Attachment E which identifies finished levels
across the site and extent of cut and fill proposed.



Item 18 -

Provide information regarding the trucks expected to access the site and include in particular:
(a) Types of trucks expected to access the site for petrol fuelling and the refuelling of fuel storage tanks.
(b) Access path of deliveries and service vehicle from the roads and within the site.
(c) Plan/s to show the manoeuvring and truing movements for delivery trucks accessing the loading bay/s of the food
store and the fuel storage tanks for refuelling (clarify if the fuel tanks are above or underground).
Response:

Refer to Plans 14004- DA 14 A, 14004- VTP 01 A, 14004 VTP 02 A at Attachment A and Traffic Addendum prepared by
PTT (Attachment F). Types of trucks and movement paths are identified within those plans. Fuel tanks are located
underground as per plan 14004- DA 14 A.



Item 19 -

Justification for the proposed commercial development having access via Ferrells Road, which functions as a minor
residential collector street, or alternatively, provide amended plans and analyses based on all access via the proposed
Myall Street access. If access to and from Ferrells Road continues to be proposed, explain how service vehicle ingress or
egress via Ferrells Road will be avoided.
Response:

The proposal plans have been amended to remove access to Ferrells Road. All access is now provided from Myall
Street. Refer to plans at Attachment A and Traffic Addendum prepared by PTT (Attachment F)




                                                             7
Log in to download the original file

MCU14_0056 Information Response Cover Letter.pdf · 736 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.