Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2020-21 Operational Plan

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
         THEME 4: LONG TERM PLANNING FOR NOOSA SHIRE

                “Noosa Shire is well managed and sustainable”



No.   Project                                                        Responsibility

1     Finalise the Climate Change Adaptation Plan and initiate       Director Environment &
      implementation of actions                                      Sustainable Development

2     Continue to implement the Noosa Transport Strategy priority    Director Infrastructure
      actions as determined by Council                               Services

3     Finalise the adoption of the new Noosa Planning Scheme         Director Environment &
                                                                     Sustainable Development

4     Establish a Placemaking Team and commence pilot project        Director Environment &
                                                                     Sustainable Development

5     Finalise the development of the Walking and Cycling Strategy   Director Infrastructure
                                                                     Services

6     Complete Asset Management Plans for pathways and               Director Infrastructure
      boardwalks and for parks and playgrounds                       Services

7     Implement recommendations arising from the Noosa Spit          Director Infrastructure
      Shoreline Erosion Management Plan (SEMP)                       Services

8     Review the Noosa Council Corporate Plan                        Chief Executive Officer




                                                                     Noosa Council | Operational Plan | Page 10
Log in to download the original file

2020-21 Operational Plan(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.