SUPERSEDED -Decision Notice - OPW22 0299 [As Published] · OPW22/0299

of 16

Text shows just the words. Original shows the document exactly as it was published.

               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               5.     Tree protection fencing must be installed under the supervision of the Project Arborist. (Refer
                      to Retention of Existing Trees Conditions).
               6.     All necessary approvals from external service providers (eg Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               7.     A condition report of the Council drainage system in Katharina Street must be completed for
                      agreement at the prestart meeting. The condition report is to include a CCTV inspection of
                      the existing pipe and structures and must include the existing pits and pipes located in the
                      frontage of No 22 Katharina Street and extend to the existing pits and pipes in the frontage
                      of No 28 Katharina Street.
               8.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to Council at the prestart meeting / prior to any works commencing.
               9.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               10.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Arboreal works.
                      c.      Fauna management works.
                      d.      Landscape works;
                      e.      Erosion and sediment control works;
                      f.      Other relevant parties
               11.    A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic Management during all aspects of the construct phase including:
                              i.       A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
                                       Control Devices (MUTCD) detailing all temporary signage and traffic control
                                       measures prior to construction.
                              ii.      Maintenance of safe vehicle and pedestrian access across the frontages of the
                                       site both during daily construction and after daily construction has ceased
                              iii.     Proposed fencing to the site during the construction phase of the development
                              iv.      Adequate parking arrangements for construction workers
                              v.       No queuing of trucks is permitted on residential streets, especially prior to
                                       7.00am. Further parked trucks must have engines turned off
                      b.      Maintenance and protection of water quality and existing drainage lines through the
                              construction site through the implementation of appropriate erosion and sediment
                              control measures
                      c.      Works programme identifying key components of the works and their respective
                              durations
                      d.      Establishment of a communication protocol with the general public, adjoining owners
                              and emergency services to advise of agreed construction times, impacts on traffic and
                              services and other relevant issues




                                                                                                        Page 4 of 16
Document Set ID: 22382767
Version: 3, Version Date: 24/04/2023

Used in these records

About this file

File size
185 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED -Decision Notice - OPW22 0299 [As Published].pdf · 185 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.