               17.    Filling, other development work or the erection of any buildings or other structures shall be
                      carried out so as not to cause any ponding of water on adjoining land or any blockage or
                      interference with any natural water course or on any other way unduly affect adjoining
                      property. In any case where it is unavoidable that the proposed development any cause ant
                      of the above disabilities, such remedial drainage or other works shall be carried out to the
                      requirements of the Shire Engineer. The design of such works shall be approved by the Shire
                      Engineer prior to the issue of a Building Permit.
               18.    The location of point for mail delivery (letterboxes) shall be to the requirements of Australia
                      Post, generally in accordance with its policy on the matter.
               Special Conditions
               19.    Prior to the issue of the Building Permit a detailed report prepared by a qualified Geotechnical
                      Engineer shall be submitted to Council for consideration and approval. This report shall cover
                      in detail the Geotechnical aspects of the design and construction of the project. Matters cover
                      in the report shall include the following –
                      a.      Identification of types of failures of the steep dune slope that could occur.
                      b.      Guidelines for establishment of foundation levels.
                      c.      Effect of lateral loading on the foundations.
                      d.      The conditions governing construction procedures for all work on the allotment must
                              be defined before it can be determined whether construction will adversely affect
                              stability. Factors to be defined include: site supervision; storage for materials;
                              discharge of water; limits to area of operation of machinery; site drainage; piling
                              techniques; removal of vegetation and revegetation.
                      e.      Further consideration must be given to possible effects of landslips on the contiguous
                              grout pile wall at the western boundary and to detailed construction procedures for this
                              wall.
                              This retaining wall is not approved at this stage, and approval will be dependent upon
                              submission of information to verify that the wall will not adversely effect the stability of
                              the dune slope generally, or the adjoining property. The accommodation of equipment
                              for construction of this wall is also of major concern.
                      f.      Impact of any filling proposed in the area of Section C.
                      g.      Measures proposed to stabilize the toe of the steep dune slope, as this is crucial to the
                              design assumptions.
                      h.      Additional detail soil investigations as necessary to verify the bearing capacity of the
                              existing materials.
                      i.      Details to verify that vibration from construction traffic using Natasha Avenue will not
                              adversely effect the stability of the steep dune slope or buildings in the area generally.
               20.    Detailed plans prepared by a registered Civil Engineer are to be submitted to Council for
                      approval with the building application, incorporating the structural design of the building, pool,
                      retaining walls ect. Full details of the proposed staging of construction including earthworks,
                      installation of the retaining walls, the pool, section of the building below existing grounds
                      levels at the side boundaries of the property, and provision of support for adjoining properties
                      shall be submitted.
               21.    The building application shall be accompanied by the following: -
                      a.      A detailed design of the proposed method of connecting the development to Council’s
                              existing sewerage system.
                      b.      Detailed design and documentation for the construction of roadworks in the Natasha
                              Avenue cul-de-sac. The design parameters shall be: -
                               i.      3.5 metre wide footpath, unless services dictate otherwise.


                                                                                                              Page 3 of 9
Document Set ID: 23480614
Version: 3, Version Date: 30/01/2025

Used in these records

About this file

File size
188 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 51984 3164 01.pdf · 188 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.