Skip to the record
Search everything, all in one place.

Council archive · source document

APPROVED Document - Concept Construction Management Plan · OPW11/0116

of 12

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

 

 

 

 

 

Component of Works Depth Liming Rates (kg/m*}
Above RL 4 75 metres AHD Nil
Wall’ Groyne Below RL 4.75 metres AND 8
(S1-S4)
Below RL -5.5 metres AHD 50
around S4
Submerged Closure Above RL -6 45 metres AHD Nil
(35 - $7) Below RL -6 45 metres AHD 50
Oredging
Above RL -3 25 metres AHD Nil
($8 - S14)

 

 

 

 

 

ffote No disturbance is expected for the Submerged Closure area below RL -6 45 metres AHD or within ite
Dredging area below RL -3 25 metres AHD

6.5 Cultural Heritage

The Noosa River Spit was artificially reclaimed in 1978 and there has been significant dredging within the river over recent
yeats. There are no identified areas or Items of cultural significance within the proposed area of the works, although a
cultural study can be undertaken if required,

\f any potentially culturally significant items are found, the contractor will cease works immediately and advise the
Superintendent. The Superintendent will notify the traditional owners to seek their advice before works in that area can
continue.

6.6 Waste Management

The sandy material from dredging / excavation will be used for filling containers, backfilling and foreshore nourishment within
the vicinity of the works, The sediment type is very consistent across the footprint of the works and is suitable for this
purpose,

Other wastes (rubbish etc) may be temporarily stored on site if adequately contained. The Contractor is responsible for
ensuring that all waste is disposed of at suitable onshore facilities. Every effort is to be made to ensure that liter and other
debris does not enter the waters. Any material or objects dropped onto the bed are to be recovered. Visual monitoring is to
be undertaken,

 

The seabed is to be checked prior to completion of the works. All waste materials (including anchor blocks and ropes used
during construction) are to be removed and not buried or left on the seabed.

The contractor is to implement an oil spill management plan.

Itis not anticipated thal any regulated waste will be generated as part of the works.

6.7 Air Quality Management

Air emissions from plant and equipment are to be monitored visually to ensure air quality is acceptable throughout the works.
Exhaust is to be within the specifications of the equipment and all required maintenance is to be undertaken.

 

Used in these records

About this file

File size
3.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

APPROVED Document - Concept Construction Management Plan.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.