APPROVED Document - Concept Construction Management Plan · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
6.8 Social Any complaints are to be investigated and responded to in a prompt manner. The Superintendent is to be notified of any complaints as soon as practicable. A suitable complaint register is to be kept 6.9 Flammable and Combustible Materials A list of all flammable and combustible materials, chemicals or any other potentially hazardous substances is to be noted on the MSDS register. 6.10 Greenhouse Gas Emissions All machinery is to be regularly maintained and operated in accordance with specifications to minimise possible greenhouse gas emissions. 7, ENVIRONMENTAL MANAGEMENT MONITORING REQUIREMENTS Monitoring requirements are to be as below, in addition to any ERA Licence requirements Issue _ Monitoring : Frequency/Timing _| Performance Criteria | Responsibility Water Quality Visual Inspection Daily during dredging | No visible turbidity Contractor hours plume from dredging | >200m from the dredge site No visible oil, grease. | floating scum or litter _ Noise Aural inspection of | Weekly during __| Noise levels in Contractor equipment for dredging accordance with excessive noise equipment specification. Investigation of noise | As required in | Complaints responded | Contractor complaints response to any noise | to within 24 hours ee _ complaints J _ Air Quality Visual inspection for Daily during dredging | No excess machinery | Contractor excess machinery hours exhaust ee exhaust emissions st pl _ Waste Management Visual inspection of Daily during dredging | No uncontained litter | Contractor | site for floating debris | hours waste | | for barge/dredge _ 8. CONTINGENCY PLANS & EMERGENCY PROCEDURES Should any non-confirming results be observed or recorded, works are to suspended immediately and the Superintendent is to be notified. A procedure for non-conformance is prepared for each Project. This procedure incorporates: Work Instructions issued Non Conformance Report Form Reporting Procedure Corrective Action A number of specific detailed contingency plans are to be prepared and include an oil spill management plan and a waste management plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED Document - Concept Construction Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.