2018-05-14 General Committee Meeting Agenda

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                                14 MAY 2018


 FINANCE RISKS                                                        MITIGATION
Clashes with Telstra services give rise      Contractor is aware of Telstra services attached to bridge.
for contractor claiming variation costs.     Relocation plans will be designed in the design phase in close
                                             cooperation with service providers.

Contingency amount being insufficient.       Risk is mitigated through appointment of experienced
                                             contractor and contract supervision of experienced
                                             Superintendent.



           PROGRAM RISKS                                              MITIGATION
There is the potential that the project is   Construction during the typically dry season aims to mitigate
delayed due to wet weather.                  this. Expected wet weather days are included in the tenderers
                                             timeline.

Resource risk.                               Casa Engineering have nominated a capable team to
                                             undertake construction.

Structure construction takes longer          The contractor is well resourced and has the available
than allowed for.                            recourses to deliver this project successfully in conjunction
                                             with current works on hand. The use of precast materials such
                                             as concrete piles and deck units reduce the risk of
                                             construction delays.



            SAFETY RISKS                                              MITIGATION
Height of existing bridge to be              Casa Engineering has extensive experience at working at
demolished and construction of new           heights and would be appointed as the Principal Contractor
bridge.                                      responsible for all Workplace Health and Safety of the site.

                                             Prior to construction commencing a safety in design report,
                                             work place health and safety and traffic management plans
                                             will be required to be submitted to Council for review.

                                             Regular audits on contractor compliance with these approved
                                             plans will be undertaken by Council and WH&S teams
                                             throughout construction.

Construction using machinery and             The contractor is certified to AS 4801 (Occupational Health &
hoisting involved.                           Safety Management Systems) and the contractor
                                             demonstrated their capability in WH&S very well in its tender
                                             bid. In addition the contractor is very experienced having
                                             successfully completed several similar type bridge projects
                                             within the past 5 years.




                                                                                              Page 15 of 74
Log in to download the original file

2018-05-14 General Committee Meeting Agenda(PDF, 10MB).pdf · 10.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.