Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2018-05-14 General Committee Meeting Agenda

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   14 MAY 2018




                                   Page 53 of 74

GENERAL COMMITTEE MEETING AGENDA                                                                                         14 MAY 2018

             zones. The key focus of the petition is to ensure community access and use of the foreshore parks is not
             compromised by expanding commercial enterprises.
             The petition was published online at www.change.org and acquired 1,138 signatures.
                  4.  Submission from The Noosa Wedding Organisation with 7 signatures
             The submission reinforced support for an undercover structure suitable for wedding ceremonies (wedding
             chapel) that could also be used for community and individual events. Additionally, the submission
             supported the public jetty proposal as a beneficial asset to the tourism industry, encouraging water-based
             transport options within the area.
             The submission also gave support for allowing the Noosa Waterfront Restaurant to use the parkland
             adjacent to the restaurant for wedding receptions.

             2.2    Community Groups and Representative Organisations
             Numerous community groups and representative organisations lodged submissions on behalf of their
             various organisations. These have been listed below and further summarised in Section 2.3.

             -    Noosa Integrated Catchment Association Inc
             -    Noosa Waterfront Restaurant
             —   Tourism Noosa
             -    Noosa Wedding Organisation
             -    Noosa Outrigger Canoe Club
             -    Noosa Residents and Ratepayers Association Inc.
             -    Noosa Parks Association
             -    Peregian Beach Community Association Inc.
             -    Noosa Community Biosphere Association Inc.
             -    NC Oliver Group of Companies

             2.3    Key Issues and Responses
             The community and stakeholder feedback has been categorised based on key issues or points of feedback
             raised from the Draft Foreshore Master Plan.

               Feedback and Issues Raised                           Response
               Noosa Outriggers and Noosa Yacht & Rowing Club Re-location
               Concerns about logistics and safety of launching and | The Draft Foreshore Master Plan does not
               storing outriggers largest canoes near the Noosa     prescribe the outriggers canoes to be moved
               Yacht and Rowing Club (NYRC).                       from their current location. Council
                                                                    acknowledges the constrains with storing and
                                                                    launching these canoes.
                                                                    Council does not support construction of a club
                                                                    house building in the current permit location and
                                                                    seeks to investigate opportunities to consolidate
                                                                    clubs in a multi-use facility, with guiding
                                                                    principles of this strategy to be included in the
                                                                    Final Foreshore Master Plan.
               Commercial Lease Extents

                                                                                                                            place
                                                                                                                            design
             6        Final Consultation Summary — Noosaville Foreshore Land Use Master Plan                                group.

                                                                                                                        Page 53 of 74
Log in to download the original file

2018-05-14 General Committee Meeting Agenda(PDF, 10MB).pdf · 10.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.