Original source · versioned page text
Attachment 1 - Current Approval for MCU
Attached to the e-mail 132007.12.06 Application to Change Development Approval.
132007.12.4
12.2.5. Retail Business Type 2 Shop or Entertainment and Dining Business Type
1 Food and Beverages – 236m2 (includes 16m 2 of outdoor dining).
13. Any new hot water systems installed shall be either solar systems; electric heat pump
systems; or gas systems (LPG or natural).
14. Any new kitchen, laundry and bathroom fittings are to comply with the AAA Water
Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products -
Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage
Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per
min. Dishwashers and washing machines are excluded from this requirement.
15. The education use is permitted a maximum number of staff/employees at any one time: -
15.1. Stage A – a maximum of 7 staff/employees and 70 students.
15.2. Stage B – a maximum of 14 staff/employees and 140 students.
16. The development shall be undertaken in accordance with the recommendations of the
Acoustic Report prepared by TTM Consulting (SC) Pty Ltd.
17. Security in the form of a cash bond or trading bank guarantee to the sum of $25,000
must be submitted, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit.
18. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to
in this approval to effect compliance with conditions.
19. The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses if
the use has not happened by 17 February 2014, unless an application to extend the
currency is approved by Council.
20. The developer must obtain all of the other Development Permits referred to in the
Decision Notice, prior to obtaining a Development Permit for Building Works.
Land Development
Reconfiguring a Lot
21. The lot reconfiguration shall be in accordance with plan SP196846 as submitted by
Jones Flint & Pike Pty Ltd except as modified herein.
22. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form
with the fees prescribed in Council's adopted fee schedule.
23. Pursuant to Section 3.7.3(3)(c) of the Integrated Planning Act, all outstanding rates and
charges due and payable to Noosa Council in respect of the lots being reconfigured shall
be paid prior to endorsement of the Plan of Survey.
24. The applicant shall provide a 2m by 2m truncation on each corner of Lot 4 adjacent to
Lot 1 on RP802360 on either side of Council’s pathway to assist service vehicle access.
An underground electricity service shall be provided to service all parts of Lot 4 if not
already provided. The service shall be provided before the use commences.
25. All parts of lot 4 shall be serviced by water supply appropriate for necessary
requirements, such as fire fighting. The service shall be provided before the use
commences.
PD-DA-FM383/5-09/08/2010 Page 4 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1 - Current Approval for MCU.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.