Attachment 1 - Current Approval for MCU
Attached to the e-mail 132007.12.06 Application to Change Development Approval.
132007.12.4
Acid Sulfate Soils
53. As the site is located below the 5m AHD, any excavation works consisting of 100m 3 or
greater and/or any filling works consisting of 500m3 or greater and with an average depth
of 0.5m or greater will need to be carried out in accordance with State Planning Policy
2/02 Planning and Managing Development Involving Acid Sulfate Soils. In this regard
appropriate testing and supporting documentation prepared by a suitably qualified
specialist shall be submitted to Council for approval prior to obtaining a Development
Permit for Operational Works.
Erosion and Sediment Control
54. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
55. Monetary contributions shall be paid to Noosa Council towards the cost of providing
and/or upgrading various infrastructure at the rates applicable at the time of payment.
An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
STAGE B TOTAL
Contribution Required For: STAGE A (in addition Stage A +
to Stage A) Stage B
PSP12 – Public Open Space Contributions (Park) $ 3,233 $0 $ 3,233
PSP16 – Sewerage Headworks Contributions $ 34,617 $ 14,785 $ 49,402
PSP17 – Water Supply Headworks Contributions $ 29,629 $ 25,727 $ 55,356
PSP20 – Pathway Trunk Network Contributions $ 3,266 $0 $ 3,266
TOTAL Contribution Amount = $ 70,745 $ 40,512 $ 111,257
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from SEPTEMBER 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works for the relevant stage.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should
not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s
Land Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses
or is cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General
56. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works that will become Council infrastructure, which
shall be submitted in conjunction with an application for a Development Permit for
Operational Works. To avoid conflict with underground pipes or services, all existing and
proposed services required by the development shall be shown on the plans.
57. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
PD-DA-FM383/5-09/08/2010 Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1 - Current Approval for MCU.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.