Attachment 1 - Current Approval for MCU
Attached to the e-mail 132007.12.06 Application to Change Development Approval.
132007.12.4
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system,
bypassing the grease/oil arrestor and treatment system.
A maintenance plan for the treatment devices shall be complied with for the duration of
the approved uses.
A Development Permit for Building Works shall not be granted until a Development
Permit for Operational Works has been issued in regard to the drainage scheme.
47. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
48. All parts of the site shall be connected to Council’s existing sewerage reticulation
systems and be constructed in accordance with Council’s standards and requirements at
no cost to Council.
Town Water Supply
49. All parts of the site shall be connected to Council’s existing town water supply and be
constructed in accordance with Council’s standards and requirements at no cost to
Council.
50. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the
development shall be served by:
50.1. A single Body Corporate water meter to measure the total water consumption
(including fire hose reels, but excluding fire hydrants and fire sprinkler systems),
and
50.2. Individual water meters to each tenement capable of being separately rated, and
50.3. A fire service (fully testable single detector check with metered bypass), where
applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
reels).
Earthworks
51. Filling works required on site shall be carried out in accordance with Section 3.8 of
Council’s Engineering Design Standards Manual and so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any
existing overland flowpaths. Detailed site surveys indicating natural surface levels and
contours of the adjoining properties must be provided with the application for a
Development Permit for Operational Works for Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-
path within the development site that caters for drainage from the adjoining sites for a
design storm with an Average Recurrence Interval of 1 in 100 years. A private easement
for the Drainage of Water encompassing the drainage pipes or overland flow-path will
also be required. In this regard a Development Permit for Operational Works shall be
obtained.
Should evidence be provided to Council indicating that no additional ponding of
stormwater will occur on the adjoining properties the requirement for the drainage pipes,
overland flow-path and easement shall not apply.
52. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this
regard any fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
PD-DA-FM383/5-09/08/2010 Page 7 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1 - Current Approval for MCU.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.