Original source · versioned page text
Reference Document Bushfire Hazard Assessment & Management Plan 131998.981.5
Plans and drawings: the text below has words only, no drawings.
Very large file (22.4 MB): may take a few minutes to open.
Bushtre Hazard Assossmont & Managomant Plan v4 Lot 7 on RP216403, Lot 304 on M371117, and Lot 650 on M37380 ~ 48-69 Kabi Road, Cootharaba NCES REF: Joo1061 ‘Table 5 ~ Table 8.2.3.3 Bushfire Hazard Areas — Part 8 Overlay Code Noosa Plan 2020 Safety of people and property Pot Development maintains the safety of people and property from the adverse impacts of bushfire. A014 Development which will materially increase the number of people living or congregating on premises, including reconfiguring a lot, is not located within a medium or high bushfire hazard area. A01.2 Development maximises setbacks from hazardous vegetation to achieve an acceptable risk. Editor's Note —PSP8 Natural Hazards provides guidance for assessing bushfire hazard risk and preparing a bushfire hazard management plan. This Bushfire Hazard Assessment and Management Plan has been prepared to maintain the safety of people and property from the adverse impacts of bushfire. AO1.1 ~ The proposed development footprint is entirely located outside of a mapped medium or high bushfire hazard area as depicted on the Local Hazard ‘Area Map Plan BF03. AO1.2 - The development has provided minimum setbacks between the proposed buildings and hazardous vegetation to achieve the SPP Assessment Benchmark 3 ‘vulnerable use ‘criteria of <10kWim? radiant heat flux exposure (refer Plan BFO4). This setback achieves an acceptable risk where all the mitigation measures detailed within this report are employed. Impact on Ecologically Important Areas poz Bushfire mitigation measures do not adversely impact on: a) biodiversity values, connectivity and ecosystem functioning; and b) the long term physical integrity of waterways, wetland and areas of native vegetation. No acceptable outcome provided PO2 - The bushfire mitigation measures prescribed herein will not adversely impact on biodiversity values, connectivity, ecosystem functioning, and the long- term physical integrity of waterways, wetlands and areas of native vegetation, Minor edge clearing of an existing modified vegetation unit may be required along the roadway to ensure the risk of access/egress becoming constrained during a bushfire eventis low (i.e., to establish the recommended minimum 10m wide cleared area, inclusive of the roadway). Water Supply for Fire Fighting Purposes PO3 Development provides an adequate water supply for firefighting purpose which is reliable, safely located and freely accessible. 03.1 Premises are connected to the reticulated water supply. Editor's note—For reconfiguring a lot, water supply needs to provide for a minimum flow and pressure of 10 litres a second at 200kPa at all times for firefighting purposes. OR A03.2 Where there is no available reticulated water supply, the premises has: a) an accessible dam, swimming pool or water tank available for firefighting purposes with an onsite water volume of not less than 5,000 litres; and b) a water supply outlet pipe 50 millimetres in diameter fitted with a standard fire brigade fitting connected to the water supply (other than where the water supply is in a swimming pool or dam). AO3.1 — No reticulated water is currently available to the site. The water supply requirements of SPP Assessment Benchmark 4 prevails; 10,000KL per new building located within a confirmed bushfire prone area. Only the eastern wing of cabins (7 cabins total) is captured within a confirmed bushfire prone area (refer Plate 20). The approximately footprint of all 7 cabins captured within the confirmed bushfire prone area is 320m which is about the size of a single large residential building. Therefore, the provision of 10,000 litres to service all 7 cabins is sufficient. Itis noted that a 300,000 litres tank is proposed adjacent to the southeast easter wing of cabins. The required 10,000 litres can be provided within this larger tank or alternatively as a separate 10,000 litres tank which should be located centrally to all cabins. The 10,000 litres supply is to be reserved for firefighting purposes only to be shared between 2 cabins. Plate 21 outlines an example of reserve water supply in a standard tank. Note, the reliance upon dams or pools for water storage is not an acceptable solution under the SPP. ©2024 We
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.