2016-06-07 - P&E Agenda - Item 3, Attachment 1 - Noosa Parklands Draft Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnRelevant objective Action Responsibility Timing Required resources
Continue to monitor the presence of salvinia in the park’s lagoon and keep Noosa Council’s Ongoing Part of Council’s current
a watching brief on new control methods to inform Council’s pest control Parks and Natural pest management
program. Areas team program
To minimise the risk of spreading weeds, review and update contract Noosa Council’s Ongoing (as per the Part of Council’s current
conditions for mowing contractors to mow grassed areas within the park Parks and Natural maintenance schedule operational program
only, and wash down mowers onsite after use. Areas team in Appendix 8)
Communicate with local residents regarding the negative impacts Noosa Council's Ongoing Part of Council’s current
associated with dumping garden waste or allowing garden weeds to Environmental operational program
spread into Bushland Reserves (via media releases, education material Services team (in
and workshops). consultation with
Parks and Natural
Areas, local
residents, Heritage
Park Bushland Care
Group and Noosa
Landcare)
Develop a linking pathway at the southern end of Heritage Park (including Noosa Council’s 2017/2018 (subject to New initiative
boardwalk) and install a bench seat at two of the playgrounds (Figure 4). Parks and Natural budget deliberations) $55,000 for new pathway
This should include reviewing boardwalk design to allow for free flowing of Areas team
water born debris (e.g. arched design). $20,000 for new
boardwalk
Install a netball hoop at the basketball court
$1000 for bench seats
$300 for netball hoop
Funding subject to
approval through the
Priority Infrastructure
Program (PIP)
Continue to monitor and maintain the park’s recreational areas and Noosa Council’s Ongoing (as per the Part of Council’s current
associated infrastructure (e.g. signs, pathways, boardwalks, tables, Parks and Natural maintenance schedule operational program
playgrounds, basketball court, mowing and bindi spraying). Areas team in Appendix 8)
Final draft Noosa Parklands Park Management Plan page | 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.