Log in to see the plans as drawnRelevant objective Action Responsibility Timing Required resources
Engage experts to assess bushfire fuel hazard for the park and based on Noosa Council’s 2017/2018 (subject to New initiative ($1,000 for
the results of this assessment, Council will determine the planned burn Parks and Natural budget deliberations) expert to assess bushfire
frequency for the park. Areas team fuel hazard)
Council officer time to
determine burn
frequency
Expand the fire trail network to all Noosa Parklands Park bushland Noosa Council’s 2015/2016 funded Estimate additional costs
reserves (Figure 4). Maintain as part of Council’s operational maintenance Parks and Natural through current fire trail to maintain clearances
schedule (see action below) Areas team budget along boardwalks and
Include 1 m clearances along boardwalks to protect timber from bushfire include in 17/18
operational budget
Continue to slash the park’s fire trails and inspect trees along the park’s Noosa Council’s Ongoing (as per the Part of Council’s current
pathways and boundary fire trails. Parks and Natural maintenance schedule maintenance schedule
Areas team in Appendix 8) program
Engage a qualified arborist to complete a pro-active risk/benefit Arborist Ongoing (as per the New initiative for
assessment of trees within the park’s recreational areas and along maintenance schedule 2017/2018 for additional
boundary fire trails. in Appendix 8) arborist resources
Ensure that hazardous trees that have to be felled are removed from the (subject to Budget
site or chipped. Review deliberations)
Continue the mosquito surveys within the park to inform Council’s vector Noosa Council’s Ongoing (as per the Part of Council’s current
control program. Vector Control team maintenance schedule maintenance schedule
in Appendix 8) program
Continue to maintain road culverts at creek crossings on Griffith Avenue, Noosa Council’s Civil Ongoing (as per the Part of Council’s current
Carramar Street, and Golf Course Drive. Works team maintenance schedule maintenance schedule
in Appendix 8) program
Continue to investigate and enforce unauthorised actions within the park Noosa Council’s As required Part of Council’s current
under relevant Noosa Council local laws (e.g. illegal dumping activities). Regulatory Services regulatory services
program
Final draft Noosa Parklands Park Management Plan page | 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.