MCU10/2116 & REC10/2072 Development Application part 2 planning report 5 Opal Street Cooroy
19
13. RESIDENTIAL USE CODE
Specific Outcomes
Effects of use
Electricity supply infrastructure
01 The development does not adversely The scale of the development will not impact
impact on existing or future electricity supply upon the existing and future electricity supply
infrastructure; infrastructure.
AND
02 All uses and works maintain an adequate The site is remote from any major electricity
safe distance from electrical infrastructure infrastructure.
including substations, overhead powerlines,
power poles and transformers.
Hot Water Systems
03 Hot water systems are installed and Hot water systems installed can be-
operated to support the efficient use of natural a) solar systems; or
resources and minimise consequent pollution b) electric heat pump systems; or
such as greenhouse gas emissions. c) natural gas or LPG systems; or
d) any combination of a), b) or c).
Water supply and conservation
04 On-site water storage is designed and Water saving measures can be implemented
as a part of the conditions of approval.
operated to support the efficient use of water;
AND
05 On-site water storage is adequate for
occupants every day use and fire fighting
purposes.
19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU10/2116 & REC10/2072 Development Application part 2 planning report 5 Opal Street CooroyRelated documentApplication case desk ↗
MCU10/2116 & REC10/2072 Development Application part 2 planning report 5 Opal Street CooroyRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.