Council archive · source document
MCU10/2116 & REC10/2072 Development Application part 2 planning report 5 Opal Street Cooroy
20
Erosion and sediment control
06 Development does not cause erosion or No solution provided.
result in transport of sediments off-site.
Safety and security
07 For Multiple Housing Types 2, 3 and 4, The access to all units is clear and visible.
buildings and outdoor spaces are designed to
protect the personal security and safety of Access to the rear yards is also provided directly
residents by allowing for natural surveillance. from Common Property.
Emergency access
08 For Multiple housing Type 3, 4 & 5, site Emergency access available.
design and layout ensures efficient access and
egress for emergency vehicles.
Basement drainage
09 Buildings and access works are designed The site and parking areas drain by gravity.
and sited to protect persons and property in the
event of a flood and power failure.
Separation of incompatible uses
010 Development is designed to minimise noise Bedroom windows of the units are 4m away
carrying between dwelling units or from boundaries and are more than 6m from
accommodation units by locating noise sensitive shared driveways.
spaces such as bedrooms away from noise
generating areas of the development, such as
carparking areas or mechanic plant and
equipment or recreational facilities.
20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU10/2116 & REC10/2072 Development Application part 2 planning report 5 Opal Street CooroyRelated documentApplication case desk ↗
MCU10/2116 & REC10/2072 Development Application part 2 planning report 5 Opal Street CooroyRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.