Original source · versioned page text
Appendix D - traffic impact assessment
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application D - Traffic Impact assessment Email 5 of 8.
PM Peak Hour
2028
AM Peak Hour
2028
Figure 3.4: Indicative Warrant for Turn Treatments - 2028 Traffic Scenario at Elm Street / Lamonts Road
(Source: DTMR Roads Planning and Design Manual, Chapter 13, Figure 13.23)
Table 3-3: Elm Street (Cooroy Connection Road) / Lamonts Road intersection SIDRA assessment outcomes, 2018 Base
Year and 2028 Design Year – priority control (give-way sign)
Degree of Level of 95th Percentile Queue Delay
Scenario Saturation Service (LOS) Length (m) (s)
Base Development Year 2018
2018 AM Peak Hour – without 0.39 C 12 2
development traffic
2018 AM Peak Hour – with 0.39 C 13 2
development traffic
2018 PM Peak Hour – without 0.30 C 22 2
development traffic
2018 PM Peak Hour – with 0.32 C 25 3
development traffic
Design Horizon Year 2028
2028 AM Peak Hour – without 0.55 C 32 4
development traffic
2028 AM Peak Hour – with 0.55 C 34 4
development traffic
2028 PM Peak Hour – without 0.43 C 54 5
development traffic
2028 PM Peak Hour – with 0.47 C 58 5
development traffic
Note: the above values are the “worst” values resulting from the assessment
B14158ER01 | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.