Approved Plan - Landscape Specification prepared by URBIS - OPW24/0110
HOLD POINTS
Grading
10 On-Grade subsoil drainage installed and tested prior to backfilling.
11 Pavement areas compacted prior to spreading base material.
12 Planters clean of all rubbish and construction debris prior to soil placement.
Planting
13 Written confirmation from nurseries that any plant stock located within
shade houses have been relocated to allow for full sun hardening 4 weeks
prior to delivery date
14 Cultivated subgrade to all turf and planting areas to specified depths.
15 Site fencing installed to exclude all site traffic from cultivated areas. Ensure
no cultivated areas are recompacted by site traffic. This is critical to ensure
long term plant growth success.
16 Plants / transplant when delivered to site, prior to being unloaded from the
truck Contractor to check for transport related damage, plant form and
suitability for installation.
URBIS
URB-P0003847-000-SP.DOCX PAGE 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.