Approved Plan - Landscape Specification prepared by URBIS - OPW24/0110

of 128

Page text read automatically using OCR, there may be inaccuracies

4.          CRITICAL HOLD POINTS
The Contractor must request the Landscape Architect to attend inspections or provide approval at the
required critical hold points noted in this document. It is the Contractor’s responsibility to adequately notify
the Landscape Architect.

Sufficient allowance of timing needs to be provided for to allow for rejection of works and re-work or re-
ordering of materials, to then not affect the overall project delivery timeframes.

Lead times for ordering of all components in addition to and allowing for hold point inspections or shop
drawing reviews must be organised by the Contractor.

Any failure to co-ordinate these points resulting in delays, or demolition and re-construction of works,
extension of maintenance periods or ability for handover certification to be undertaken, are the responsibility
of the Contractor.




4.1.        HOLD POINT SCHEDULE
         HOLD POINTS

     1   Council / Authority approvals conditions have been supplied to Contractor / Head Contractor, and
         incorporated into the Construction Documentation set

     2   Tree, palm and plant species stock ordering, upon award of construction contract. Early approval is
         critical to avoid construction delays

     3   Tree protection fencing in place

     4   Sample, shop drawings for all balustrade/ handrails / fence / gates provided for all balustrade / handrail
         / fence / gates types – sogn off from Balmain & Co

         HOLD POINTS                                                                         CHKD DATE / NOTES


 Soil Testing

     5   Soil testing of proposed imported soils supplied to Landscape Architect for
         approval. Early testing and approval critical to avoid construction delays
     6   Soil testing of retained site soils carried out. Soil testing of ameliorated site
         soils supplied for approval. Early testing and approval critical to avoid
         construction delays
     7   Soil delivery dockets showing Soil Supplier and batch information.


 Set out

     8   Set out of hardscape areas.

     9   Set out for walls and edges




URBIS
URB-P0003847-000-SP.DOCX                                                                                      PAGE   6

Log in to download the original (Approved Plan - Landscape Specification prepared by URBIS - OPW24_0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.