Approved Plan - Landscape Specification prepared by URBIS - OPW24/0110
Mulch –100mm depth, ‘Medium’ grade, aged / composted hoop pine bark fines Soil A - 300mm depth ‘On Grade soil media A’ Soil B - where trees are planted, 600mm depth ‘On Grade soil media B’ Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum two weeks prior to lawn installation). Rip to 250mm depth. Where clay conditions are found, incorporate gypsum or clay breaker at the rate of 100g/m2 Note: Soil types under D&C arrangement - compliant to relevant AS and codes. GA07: Garden Bed Profile – Community Garden Planter beds Mulch - 50mm depth, Sugarcane mulch Soil - 300mm depth ‘On Slab soil media A’. Refer to Section – Soils, for test results criteria, 300mm depth ‘On Slab soil media B’. Refer to Section – Soils, for test results criteria. Sand filter - 50mm depth (depth varies) to bottom of planter Note: Soil types under D&C arrangement - compliant to relevant AS and codes. GA08: Garden Bed Profile – On Grade without mulch Mulch – no Soil A - 200mm depth ‘On Grade soil media A’ - Optimum Soil Type is Sandy Loam Subgrade Preparation - Remove all existing weed material using glyphosate herbicide (to be applied minimum two weeks prior to lawn installation). Rip to 150mm depth. Note: Soil types under D&C arrangement - compliant to relevant AS and codes. Note that these areas are for seeding application: Optimum Sowing Temperature: Between 15 and 25 degrees celsius Watering: All landscaped areas need water in dry periods. Dichondra will need additional irrigation in hot Summer months. Water at least twice a week – more frequently in extreme weather weeks. *During the first 30 days after seeding watering may be necessary 3-4 times a day. Seed should not be allowed to dry out. Starter Fertiliser: We recommend KickStart - a Starter Fertiliser to ensure successful germination. Apply 3kg of fertiliser per 100sqm (30 g/m2) Sowing Rate: New Sowing: 1kg per 100m2 GA09: Garden Bed Profile – Infiltration Basin Installation of basin by civil. URBIS URB-P0003847-000-SP.DOCX PAGE 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.