Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Approved Plan - Landscape Specification prepared by URBIS - OPW24/0110

of 128

Page text read automatically using OCR, there may be inaccuracies

 Mulch – no
 Soil – 100mm depth imported topsoil
 Installation – Empty water from basin, install topsoil, wait until basin is filled up again with water before
 planting.

 Note: Soil types under D&C arrangement - compliant to relevant AS and codes.




URBIS
URB-P0003847-000-SP.DOCX                                                                                         PAGE   40

Log in to download the original (Approved Plan - Landscape Specification prepared by URBIS - OPW24_0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.