Approved Plan - Landscape Specification prepared by URBIS - OPW24/0110

of 128

Page text read automatically using OCR, there may be inaccuracies

17.         IRRIGATION SYSTEM

17.1.       GENERAL SPECIFICATIONS
It is the Head Contractors responsibility to co-ordinate all required Approval Authorities connection
approvals and certificates.

Individual courtyards / levels / areas are to be capable of being individually programmed.

Water meter to common areas per Hydaulic Design by Balmain & Co.

All irrigation designs within all landscape and turf areas must apply a distribution uniformity equal to or
greater than 75% (DU).

The scheduling of the irrigation system (Automatic Control Programs) shall be set to achieve the maximum
efficiencies possible. The application rate of the system must not be greater than the infiltration rate of the
soil. Pooling of irrigation water on the surface will not be accepted. Adding “cycle & soak” to the irrigation
programs will eliminate this scenario where the application rate of the irrigation system exceeds the
infiltration rate of the soil.

All irrigation conduits on basement and podium are to be cast into the structural slab. This and all
penetration through the structural slab are to be closely coordinated with structural engineer and
hydraulic engineer.

Full description of the required system and its components are to be listed in the submitted documentation.
This documentation should include drawings and schedule of quantities. It is the responsibility of the
Irrigation Contractor to ensure they have all the relevant documentation and to provide a detailed Schedule
of quantities. If a "Lump Sum" submission is tendered it will be presumed that all the required items have
been included in the Tender price.

If existing Services are located on site, it is the contractor’s responsibility to source all existing as constructed
information for all services for local authorities or/and client before commencement of works. The contractor
must obtain approval from the client prior to commencement of any excavation in the vicinity of existing
services.

Submit all documents to the Landscape Architect for review and approval. Locations of meter boxes,
mains connections and valve and meter box locations to be approved by Landscape Architect.

The equipment and installation processes described are intended to produce an irrigation system which
complies with all applicable industry and local authority and Australian standards.

The Irrigation Contractor will inspect the site and verify the available water flow and pressure, prior to
lodgement of design and Tender. The Irrigation Contractor will be responsible for all works required. Items
not specifically described in this Specification, but which would normally be required to produce a fully
functioning irrigation system are to be considered part of the required works.

It is the Irrigation Contractor’s responsibility to bring to the Superintendent’s attention any concerns, potential
obstacles or possible improvements before construction commences.




URBIS
URB-P0003847-000-SP.DOCX                                                                                      PAGE   48

Log in to download the original (Approved Plan - Landscape Specification prepared by URBIS - OPW24_0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.